Two dockets decide what large-load interconnection costs and how it works: 58481 (the proposed §25.194 standards — fees and security) and 59142 (the Batch Zero protocol package). Four SB 6 satellites orbit them. The Interchange is JS-rendered and unfeedable; this page is the feed.

§ 01

Latest filings

showing the 60 most recent of 511 tracked filings · full per-docket JSON on the data page

№ 58481
Apr 17, 2026
item 178
CONSTELLATION ENERGY GENERATION, LLC
CONSTELLATION ENERGY GENERATION, LLC’S COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194
№ 58481
Apr 17, 2026
item 183
STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWER
The Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Proposal for Publication of New 16 TAC § 25.194
№ 58481
Apr 16, 2026
item 156
SATOSHI ENERGY CORP.
SATOSHI ENERGY COMMENTS ON STAFF'S PROPOSAL FOR PUBLICATION ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561
§ 02

Watched dockets

Docket What it decides Filings
58481 Proposed §25.194 — large-load interconnection standards interchange.puc.texas.gov ↗
59142 Large-load batch study process (PGRR145/NPRR1325 package) interchange.puc.texas.gov ↗
58479 SB 6 — net metering interchange.puc.texas.gov ↗
58480 SB 6 — forecasting (§25.370) interchange.puc.texas.gov ↗
58482 SB 6 — demand reduction interchange.puc.texas.gov ↗
58484 SB 6 — 4CP interchange.puc.texas.gov ↗