Data
| Source | Publisher host | Coverage | Evidence |
|---|---|---|---|
| Adjacent SB 6 dockets | interchange.puc.texas.gov | 58479 net metering, 58480 forecasting (§25.370, effective 2026-03-01), 58482 demand reduction, 58484 4CP. | Open |
| Current Protocols (Nodal Protocols sections and Section 23 forms) | www.ercot.com | The canonical Nodal Protocols text and forms. The Large Load Integration page links Section 23 Form W (PCLR declaration) and Form X (WLPUN designation) here rather than to direct files since 2026-07-15; the NPRR1325-era forms became 23W/23X-071126_Nodal.docx on this page. | Open |
| ERCOT legislative-hearing update decks | www.ercot.com | ERCOT's own slide decks prepared for Texas legislative committees. These are primary ERCOT documents and they routinely publish Batch Zero process detail that appears nowhere else — the 2026-07-29 Senate Business & Commerce deck carries the "Preliminary Overview of Batch Zero Eligibility" project counts and the eligibility-evidence verification regime (sample-set review of ILLE attestations, running 2026-07-10 through 2027-04-09). IMPORTANT: these are NOT large-load interconnection status reports. Figures here must never feed data/queue_timeseries.csv, whose provenance contract admits only the LLI Queue Status Update / LLWG / TAC report series. | Open |
| ERCOT market notices archive | www.ercot.com | LLI process notices (e.g. M-B062325-01 DWG survey, M-B090225-01 net metering, M-B021126-01 RFIs). | Open |
| FERC eLibrary — SPP executed CHILLSAs and HILLGIAs | elibrary.ferc.gov | SPP's tariff obligates it to file each executed CHILLSA with FERC (Attachment BA, ER26-1323), so FERC's docket record is a complete census of executed agreements — absence there is dispositive, unlike absence from SPP's own queue. Swept applicant-first: every docket naming Southwest Power Pool, then classified. UNDOCUMENTED endpoint (the eLibrary SPA's internal REST API) that intermittently returns an empty HTTP 200 under load, so every window carries a positive control. | Open |
| Large Load Integration hub | www.ercot.com | Forms and process docs: Load Information Form v1 (xlsx), Energization Request (docx), Net Metering Notice (docx), LLI Q&A (pdf), comms instructions. Changes here signal process changes. | Open |
| Large Load Working Group hub | www.ercot.com | Agendas and decks; "Large Load Interconnection Queue" is a standing agenda item. | Open |
| LLI Queue Status Update / TAC reports | www.ercot.com | Aggregate large-load queue: MW by status tier, zone, TSP, project type, size bucket, submittal and in-service date distributions. The only public queue data; NPRR1267 (PUCT-approved 2025-07-31) mandates aggregation. | Open |
| NOGRR282 / NPRR1308 (large-load ride-through) | www.ercot.com | "Large Computational Load Ride-Through Requirements" (NOGRR282) and its companion Protocol revision (NPRR1308). Both issue pages read "Approved on 07/09/2026" (PUCT); effective date 2026-08-01 (verified 2026-07-21). NOGRR289 ("Extension for LCL Cooling Load Ride-Through Compliance", sponsor SB Energy, posted 2026-07-21) is pending against the same regime: ROS granted it Urgent status and tabled it on 2026-08-06. Watched so a status change cannot land unreviewed; it has changed nothing yet. | Open |
| PGRR145 / NPRR1325 (Batch Zero) | www.ercot.com | PUCT-approved 2026-06-18 (in Project 54445; both issue pages read "Approved on 06/18/2026"). Batch Zero and WLPUN effective 2026-07-11; PCLR upon system implementation. The 2026-07-10 and 2026-07-24 applicant submission deadlines remain historical facts. The PUCT granted ERCOT's three Batch Zero good-cause exceptions on 2026-08-20. ERCOT market notice M-A080326-02 says ERCOT intends to notify interconnecting DSPs/TSPs of each Large Load's conditional classification by 2026-08-31; that notice starts the Planning Guide §9.3.1(2)(a)(i)-(iii) dispute and reconciliation process. August 31 is an ERCOT operational target for conditional notices, not a PUCT-ordered deadline, final classification date, or final inclusion cut. No final classification or audit-completion date is published. | Open |
| Planning Guide §9 — Large Load Interconnection or Modification | www.ercot.com | Governing interconnection rule text. ERCOT published a PGRR145-era §9 ("Large Load Interconnection or Modification", 09-071126.docx, listed 2026-07-21) alongside the prior text dated 2025-12-15 (09-121525.docx, still listed). | Open |
| PUCT Project 58481 (adopted §25.194 — large load interconnection standards) | interchange.puc.texas.gov | The Commission adopted new 16 TAC §25.194 with changes in signed Order Item 218, filed 2026-09-18. Item 219 records the Secretary of State acknowledgement, TRD-202604027, and an effective date of 2026-10-08. Until that date the rule is adopted but not yet effective. The signed operative text, not Staff Item 208, controls: a flat $100,000 study fee with unused amounts returned after study; intermediate security of $50,000/MW of requested peak demand; SLLIA security equal to the greater of $50,000/MW of contracted peak demand or allocated system-upgrade costs; separate 60-day study-initiation-contact and SLLIA execution/funding clocks; and the signed §25.194(g)(3) 20% deduction for specified non-utilized transmission capacity. Project applicability still requires the facts in subsection (b), including energization status as of the effective date. | Open |
| PUCT Project 59142 (large-load batch study process) | interchange.puc.texas.gov | PGRR145/NPRR1325 protocol-package filings land here. PUCT consideration 2026-07-09. | Open |
| SPP generator interconnection active requests | opsportal.spp.org | Public CSV of active GI requests. Watched for the first appearance of a HILLGA request or its service type LLRIS (Load Limited Resource Interconnection Service, Attachment BB §1). Zero as of 2026-08-19. | Open |
| SPP generator interconnection study postings | opsportal.spp.org | Study report categories by year and type. A HILLGA study family would surface as a new labeled yearTypeId — the cheapest first-appearance detector available. 98 categories, no HILL family, as of 2026-08-19. | Open |
| SPP OASIS (OATI) — CHILLS transmission service requests | www.oasis.oati.com | A transmission service request is entered on OASIS concurrently with each CHILLSA filing. NOT machine-verifiable: SPP links it over plain HTTP (times out), and over HTTPS it serves a chain rooted in OATI's private "WebCARES Root CA", absent from public trust stores — ingest/tls.py will not disable verification to get past it. Corroboration is operator-attested only. | Open |
| Technical Advisory Committee hub | www.ercot.com | TAC meeting pages carry the LLI Queue Status report when LLWG skips a month. | Open |
No records match these filters.