SourcePublisher hostCoverageEvidence
Adjacent SB 6 docketsinterchange.puc.texas.gov58479 net metering, 58480 forecasting (§25.370, effective 2026-03-01), 58482 demand reduction, 58484 4CP. Open
Current Protocols (Nodal Protocols sections and Section 23 forms)www.ercot.comThe canonical Nodal Protocols text and forms. The Large Load Integration page links Section 23 Form W (PCLR declaration) and Form X (WLPUN designation) here rather than to direct files since 2026-07-15; the NPRR1325-era forms became 23W/23X-071126_Nodal.docx on this page. Open
ERCOT legislative-hearing update deckswww.ercot.comERCOT's own slide decks prepared for Texas legislative committees. These are primary ERCOT documents and they routinely publish Batch Zero process detail that appears nowhere else — the 2026-07-29 Senate Business & Commerce deck carries the "Preliminary Overview of Batch Zero Eligibility" project counts and the eligibility-evidence verification regime (sample-set review of ILLE attestations, running 2026-07-10 through 2027-04-09). IMPORTANT: these are NOT large-load interconnection status reports. Figures here must never feed data/queue_timeseries.csv, whose provenance contract admits only the LLI Queue Status Update / LLWG / TAC report series. Open
ERCOT market notices archivewww.ercot.comLLI process notices (e.g. M-B062325-01 DWG survey, M-B090225-01 net metering, M-B021126-01 RFIs).Open
FERC eLibrary — SPP executed CHILLSAs and HILLGIAselibrary.ferc.govSPP's tariff obligates it to file each executed CHILLSA with FERC (Attachment BA, ER26-1323), so FERC's docket record is a complete census of executed agreements — absence there is dispositive, unlike absence from SPP's own queue. Swept applicant-first: every docket naming Southwest Power Pool, then classified. UNDOCUMENTED endpoint (the eLibrary SPA's internal REST API) that intermittently returns an empty HTTP 200 under load, so every window carries a positive control. Open
Large Load Integration hubwww.ercot.comForms and process docs: Load Information Form v1 (xlsx), Energization Request (docx), Net Metering Notice (docx), LLI Q&A (pdf), comms instructions. Changes here signal process changes. Open
Large Load Working Group hubwww.ercot.comAgendas and decks; "Large Load Interconnection Queue" is a standing agenda item.Open
LLI Queue Status Update / TAC reportswww.ercot.comAggregate large-load queue: MW by status tier, zone, TSP, project type, size bucket, submittal and in-service date distributions. The only public queue data; NPRR1267 (PUCT-approved 2025-07-31) mandates aggregation. Open
NOGRR282 / NPRR1308 (large-load ride-through)www.ercot.com"Large Computational Load Ride-Through Requirements" (NOGRR282) and its companion Protocol revision (NPRR1308). Both issue pages read "Approved on 07/09/2026" (PUCT); effective date 2026-08-01 (verified 2026-07-21). NOGRR289 ("Extension for LCL Cooling Load Ride-Through Compliance", sponsor SB Energy, posted 2026-07-21) is pending against the same regime: ROS granted it Urgent status and tabled it on 2026-08-06. Watched so a status change cannot land unreviewed; it has changed nothing yet. Open
PGRR145 / NPRR1325 (Batch Zero)www.ercot.comPUCT-approved 2026-06-18 (in Project 54445; both issue pages read "Approved on 06/18/2026"). Batch Zero and WLPUN effective 2026-07-11; PCLR upon system implementation. The 2026-07-10 and 2026-07-24 applicant submission deadlines remain historical facts. The PUCT granted ERCOT's three Batch Zero good-cause exceptions on 2026-08-20. ERCOT market notice M-A080326-02 says ERCOT intends to notify interconnecting DSPs/TSPs of each Large Load's conditional classification by 2026-08-31; that notice starts the Planning Guide §9.3.1(2)(a)(i)-(iii) dispute and reconciliation process. August 31 is an ERCOT operational target for conditional notices, not a PUCT-ordered deadline, final classification date, or final inclusion cut. No final classification or audit-completion date is published. Open
Planning Guide §9 — Large Load Interconnection or Modificationwww.ercot.comGoverning interconnection rule text. ERCOT published a PGRR145-era §9 ("Large Load Interconnection or Modification", 09-071126.docx, listed 2026-07-21) alongside the prior text dated 2025-12-15 (09-121525.docx, still listed). Open
PUCT Project 58481 (adopted §25.194 — large load interconnection standards)interchange.puc.texas.govThe Commission adopted new 16 TAC §25.194 with changes in signed Order Item 218, filed 2026-09-18. Item 219 records the Secretary of State acknowledgement, TRD-202604027, and an effective date of 2026-10-08. Until that date the rule is adopted but not yet effective. The signed operative text, not Staff Item 208, controls: a flat $100,000 study fee with unused amounts returned after study; intermediate security of $50,000/MW of requested peak demand; SLLIA security equal to the greater of $50,000/MW of contracted peak demand or allocated system-upgrade costs; separate 60-day study-initiation-contact and SLLIA execution/funding clocks; and the signed §25.194(g)(3) 20% deduction for specified non-utilized transmission capacity. Project applicability still requires the facts in subsection (b), including energization status as of the effective date. Open
PUCT Project 59142 (large-load batch study process)interchange.puc.texas.govPGRR145/NPRR1325 protocol-package filings land here. PUCT consideration 2026-07-09.Open
SPP generator interconnection active requestsopsportal.spp.orgPublic CSV of active GI requests. Watched for the first appearance of a HILLGA request or its service type LLRIS (Load Limited Resource Interconnection Service, Attachment BB §1). Zero as of 2026-08-19. Open
SPP generator interconnection study postingsopsportal.spp.orgStudy report categories by year and type. A HILLGA study family would surface as a new labeled yearTypeId — the cheapest first-appearance detector available. 98 categories, no HILL family, as of 2026-08-19. Open
SPP OASIS (OATI) — CHILLS transmission service requestswww.oasis.oati.comA transmission service request is entered on OASIS concurrently with each CHILLSA filing. NOT machine-verifiable: SPP links it over plain HTTP (times out), and over HTTPS it serves a chain rooted in OATI's private "WebCARES Root CA", absent from public trust stores — ingest/tls.py will not disable verification to get past it. Corroboration is operator-attested only. Open
Technical Advisory Committee hubwww.ercot.comTAC meeting pages carry the LLI Queue Status report when LLWG skips a month.Open