Docket

Coverage checked Retrieved filings

FiledDocketItemDescriptionFiled byEvidence
5914284PUBLIC COMMENT IN OPPOSITION TO SYNERGEN GREEN ENERGY, INC.'S REQUEST FOR GOOD CAUSE EXCEPTIONRoger BroussardOpen
5914285Formal Public Comment Opposing Special Consideration for Synergen Green Energy PUCT No. 59142 Item No. 57Michelle McCabeOpen
5914283FORMAL LETTER OF OPPOSITION 59142_57_1682331Ann FloresOpen
5914280Formal Public Comment Opposing Special Consideration for Synergen Green Energy PUCT No. 59142 Item No. 57PATTY WALKEROpen
5914281Formal Public Comment Opposing Special Consideration for Synergen Green Energy PUCT No. 59142 Item No. 57Kim VanekOpen
5914282Review of ERCOT's Interconnection Processes for Large Loads Public Comments Opposing Synergen Green Energy, Inc.'s Request for a Good Cause ExceptionKim VanekOpen
5914279Project 59142 - Opposition to Synergen's Request for Good Cause Exception Relating to Batch Zero Eligibility DeadlinesBecky WiedOpen
5914278ERCOT UPDATES: BATCH ZERO VERIFICATION AND AUDIT PROCESS, DATA CENTER STATE AND COMMUNITY IMPACT RFI, AND MEDIUM LOAD RFIERCOTOpen
5914274Request for Audit for Project RaptorDouglas LindemannOpen
5914275Request for Audit for Project RaptorJennifer LindemannOpen
5914276Request for Audit for Project RaptorBob LindemannOpen
5914277Request for Audit for Project RaptorBecky LindemannOpen
5914273ERCOT UPDATE – BATCH ZERO ELIGIBILITY VERIFICATION AND STATE AND COMMUNITY IMPACT RFI PROCESSERCOTOpen
58484120PUBLIC COMMENT OF KYLE SCHLUNSKyle SchlunsOpen
58481218ORDER ADOPTING NEW 16 TAC §25.194PUC OPDMOpen
58481219Texas Register Acknowledgement of Receipt - Effective 10.08.2026RULES & PROJECTSOpen
58481217PUBLIC COMMENT – PROJECT NO. 58481 Rulemaking to Implement Large Load Interconnection Standards Under PURA §37.0561PROJECT NO. 58481Open
5914265Request for audit -Project RaptorAdam LindemannOpen
5914266Request for audit - Project RaptorKatrina FarmerOpen
5914267Review Project Raptor #59142Project RaptorOpen
5914268Project RaptorProject RaptorOpen
5914269My name is Chad Peysen and I live at 1116 Three Way Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1200 ft from my home. I would like the audit applied to Project Raptor specifically.Chad PeysenOpen
5914270My name is Heather Peysen and I live at 1116 Three Way Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1200 ft from my home. I would like the audit applied to Project Raptor specifically.Heather PeysenOpen
5914271My name is John Peysen and I live at 433 Mahler Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1 road over from my home. I would like the audit applied to Project Raptor specifically.John PeysenOpen
5914272My name is Rhonda Peysen and I live at 433 Mahler Rd, Wichita Falls, TX 76310. The 1000 MW request sits 1 road over from my home. I would like the audit applied to Project Raptor specifically.Rhonda PeysenOpen
5914258Request of audit for Project RaptorRay BaggettOpen
5914259Audit Request- Project RaptorMegan AtchisonOpen
5914260Audit Request- Project RaptorAndrew AtchisonOpen
5914261Audit Request- Project RaptorMerri Dawn BoltonOpen
5914262Audit Request- Project RaptorBrad BoltonOpen
5914263Audit Request- Project RaptorMark SteelOpen
5914264Audit Request- Project RaptorHolly SteelOpen
5914255ERCOT UPDATE FOR SEPTEMBER 11, 2026 OPEN MEETING – BATCH ZERO AND STATE AND COMMUNITY IMPACT RFI PROCESSERCOTOpen
5914256Request for Audit for Project RaptorLaura LindemannOpen
5914257Synergen's Request for Good Cause Exception Relating To Batch Zero Eligibility DeadlinesSynergen Green Energy, Inc.Open
58481216COMMENTS OF MCADAMS ENERGY GROUP ON STAFF’S RECOMMENDED ADOPTION ORDERMcAdams Energy GroupOpen
58481212SOLUNA HOLDINGS, INC. COMMENTS TO PROPOSAL FOR ADOPTION OF NEW 16 TAC § 25.194Soluna HoldingsOpen
58481213GOOD COMPANY ASSOOCIATES COMMENTS ON THE COMMISSION’S PROPOSAL FOR ADOPTION (PFA)Good Company AssociatesOpen
58481214SATOSHI ENERGY COMMENTS ON STAFF'S RECOMMENDED ADOPTION ORDER ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561SATOSHI ENERGY CORP.Open
58481215Comments of Lancium LLC on Project 58481 Recommended Adoption OrderLancium LLCOpen
58481211Vistra's Comments on Project 58481 Recommended Adoption OrderVISTRA CORPORATE SERVICES COMPANYOpen
5848264Supplemental Public Comment Clarifying Backup Generation, BESS, and Duplicate Compensation ConcernsJennifer CarrigOpen
58481209Public Comment by residential ratepayer opposing local transmission cost socialization for the Louetta Road data center development under SB 6 rules.Bailey WellsOpen
58481210Re: Project No. 58481 - Large Load Interconnection StandardsClinton Brooks HermanOpen
5848238TAEBA'S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.521TEXAS ADVANCED ENERGY BUSINESS ALLIANCEOpen
5848239ERCOT Steel Mills Comments Project 58482_Proposal for PublicationERCOT STEEL MILLSOpen
5848240GOOGLE COMMENTS FOR THE 58482 PROPOSAL FOR PUBLICATIONGOOGLE LLCOpen
5848241Comments of Texas Electric Cooperatives, Inc.TEXAS ELECTRIC COOPERATIVES, INC.Open
5848242Priority Power Comments on Proposed New 25.521PRIORITY POWER MANAGEMENT LLCOpen
5848243Texas Public Power Association (TPPA) Comments on PFPTPPAOpen
5848244Sierra Club Comments on proposed LLDMSSIERRA CLUBOpen
5848245Data Center Coalition's Comment on Proposal for Publication (Project 58482)DATA CENTER COALITIONOpen
5848246ENGIE North America Inc. Comments on Proposal for PublicationENGIE NORTH AMERICA INC.Open
5848247COMMENTS OF AEP TEXAS INC. ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATIONAEP TEXAS INC.Open
5848248COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLCCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCOpen
5848249TCPA'S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW §25.521TCPAOpen
5848250COMMENTS OF BASE POWER COMPANY ON PFP OF NEW §25.521BASE POWER COMPANYOpen
5848251Project No. 58482, Large Load Demand Management Service; Comments of the Digital Infrastructure NetworkDigital Infrastructure NetworkOpen
5848252COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW §25.521LOWER COLORADO RIVER AUTHORITYOpen
5848253ONCOR ELECTRIC DELIVERY COMPANY'S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.521ONCOR ELECTRIC DELIVERY COMPANY LLCOpen
5848254NRG Comments on Proposed RuleNRG ENERGY, INC.Open
5848255Vistra Corporate Services Company's Comments on the Proposal for Publication of new 16 TAC § 25.521VISTRA CORPORATE SERVICES COMPANYOpen
5848256ERock Comments on PFP of New §25.521ERockOpen
5848257IMM Comments for the Large Load Demand Management Service (LLDMS) P-58482POTOMAC ECONOMICSOpen
5848258The Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Proposal for Publication of New 16 TAC § 25.521STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWEROpen
5848259TNMP'S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW §25.521TEXAS NEW MEXICO POWER COMPANYOpen
5848260TEBA Comments on Proposal for Publication for Project No. 58482TEXAS ENERGY BUYERS ALLIANCEOpen
5848261Voltus Comments 58482 Round 2Voltus IncOpen
5848262ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS ON THE PROPOSAL FOR PUBLICATIONERCOTOpen
5848263Comments of the Texas Bitcoin & Grid Alliance on Proposed New 16 TAC 25.521TEXAS BITCOIN & GRID ALLIANCEOpen
58481208OM Item No. 24 - (Staff Recommendation) Order Adopting New §25.194PUC RULES & PROJECTSOpen
5848236OFFICE OF PUBLIC UTILITY COUNSEL’S COMMENTS REGARDING THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.521OPUCOpen
5848237TEXAS INDUSTRIAL ENERGY CONSUMERS’ COMMENTSTIECOpen
58481207Letter Regarding Proposed New 16 TAC § 25.194Great Bay RoyaltiesOpen
5848235Comments of Fedor Mikheev on proposed § 25.521 addressing payment structure, eligibility, procurement lead time, aggregation.Fedor Mikheev | Texas A&MOpen
58481204VOID SEE ITEM 205PUC RULES & PROJECTSOpen
58481205Memo Requesting CR Void Item No. 204PUC RULES & PROJECTSOpen
58481206Staff Memo w/Draft Recommended Changes to Proposed RulePUC RULES & PROJECTSOpen
5914252ERCOT UPDATES – GOOD CAUSE EXCEPTIONS FOR PGRR 145, BATCH ZERO VERIFICATION AND AUDIT PROCESS, AND COMMUNITY IMPACT REVIEW PROCESSERCOTOpen
5914253ORDER GRANTING GOOD CAUSE EXCEPTIONSPUC OPDMOpen
5914254SCHAPER ENERGY CONSULTING PROPOSED APPROACH TO PUBLIC BENEFIT DISCLOSURE IN THE COMMUNITY IMPACT COMPONENT OF THE LARGE LOAD AUDITSCHAPER ENERGY CONSULTING LLCOpen
5914248Ionic Digital Inc.'s Comments Regarding ERCOT's Requests for Good Cause Exceptions Relating to Batch Zero DeadlinesIonic Digital Inc.Open
5914249Request for Commission Action on Batch Zero Eligibility (CloudPeak BZ-259 & BZ-180)PowerHouse CloudPeak Venture Alpha LLC and PowerHouse CloudPeak Venture C LLCOpen
5914250Review of ERCOT's Interconnection Process for Large LoadsJordan SmithOpen
5914251Review of ERCOT's Interconnection Process for Large LoadsAnthony D SmithOpen
5848234Comments of Modern Tex Consulting LLC on Performance Reporting and Evaluation Under Proposed 16 TAC § 25.521Modern Tex Consulting LLCOpen
5914246Public Comment – Audit Standards Required Under Governor’s DirectiveSandra Gail Gilbreath WrightOpen
5914247Comments of Pallara, Inc. on ERCOT's Requests for Good Cause Exceptions Relating to Batch Zero DeadlinesPallara, Inc.Open
5914243Public Comment of Matt HoranyMatthew HoranyOpen
5914244Letter regarding ERCOT's Requests for Exceptions Relating to Batch Zero DeadlinesFirst Ammonia LLCOpen
5914245Octa's Comments on ERCOT's August 10, 2026 Status UpdateOcta Data Center Development Company LLCOpen
5914242ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REQUESTS FOR GOOD CAUSE EXCEPTIONS RELATING TO BATCH ZERO DEADLINES AND STATUS UPDATE ON ADDITIONAL MATTERS INCLUDING THE LONG-TERM LOAD FORECASTERCOTOpen
5848232Large Load Demand Services "Say No to incentives"Jennifer CarrigOpen
5848233Objection to rule changeHelen BryantOpen
5848230PROPOSAL FOR PUBLICATION NEW §25.521PUC OPDMOpen
5848231Texas Register Acknowledgement of Receipt - Comment Deadline 09/04/2026RULES & PROJECTSOpen
5848229OM Item No. 29 - Staff Memo & PFP w/Sept. 4 Comment DeadlinePUC RULES & PROJECTSOpen
5848228Public Comments in Response to Staff's Questions for Comment - Project No. 58482Fedor Mikheev | Texas A&M University Energy InstituteOpen
5914241Notice of Withdrawal – This filing formally withdraws Trailblazer Infrastructure LLC's previously submitted Informational Memorandum in PUCT Project No. 59142. The notice advises the Commission that, due to ongoing discussions among the relevant parties.Trailblazer Infrastrructure LLC.Open
5914240Project Trailblazer – Request for Legacy and/or batch zero Interconnection Process ConsiderationTrailblazer Infrastructure LLCOpen
58484119LETTER REGARDING EVALUATION OF TRANSMISSION COST RECOVERYCHAIRMAN DREW DARBYOpen
5914239First Ammonia LLC's Comments on Commission Consideration of PGRR 145, Batch Zero Process for Large Load InterconnectionsFirst Ammonia LLCOpen
5914238CYRUSONE COMMENTS REGARDING PLANNING GUIDE REVISION REQUEST PGRR145CyrusOneOpen
5914237Crusoe Technologies, LLC Comments on Recommended Approval of PGRR 145 by the ERCOT Board of DirectorsCrusoe Technologies, LLCOpen
58484118Staff Memo_New Rulemaking ProjectPUC RULES & PROJECTSOpen
5914236Comments on May 6th Staff MemorandumNightpeak Energy LLCOpen
591423575 kw large loadLARRY MARTINOpen
5914234DCC Comments on Net Metering Arrangements in Batch ZeroData Center Coalition (DCC)Open
5914233Staff memo on Batch 0 entry criteriaPUC DEPUTY EXECUTIVE DIRECTOROpen
5914232ERCOT LARGE LOAD BATCH STUDY UPDATEERCOTOpen
58484117Staff Memo and Draft ReportPUC RULES & PROJECTSOpen
5914231TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S STAFF MEMO DATED APRIL 12, 2026Tract Holding Company I, LLCOpen
5914230Staff's April 29, 2026 comments on PGRR 145PUC DEPUTY EXECUTIVE DIRECTOROpen
58484116IMM comments on transmission cost allocation.Potomac EconomicsOpen
58481203Cormint Data Systems Comments on Staff PforP in 58481Cormint Data SystemsOpen
58481202Supplemental Public Comment regarding Project 58481 - Utility Telemetry and Grid Stability.Aurora Jean BrownOpen
58481167VOLTUS COMMENTS ON LARGE LOAD INTERCONNECTION STANDARDSVOLTUS, INC.Open
58481168Comments of the Advanced Power Alliance and American Clean Power AssociationAdvanced Power Alliance and American Clean Power AssociationOpen
58481169Trammell Crow Company's Comments on Proposal for Publication of 16 TAC§ 25.194Trammell Crow CompanyOpen
58481170SB 6 ImplementationHouse State Affairs CommitteeOpen
58481171Additional Comments of Serena Power on Proposed New 16 TAC 25.194Serena PowerOpen
58481172EDF Comments on Large Load Interconnection Standards - PUCT 58481ENVIRONMENTAL DEFENSE FUND INCOpen
58481173PUCT 58481 Large Load Interconnection Standards PfP - NRG Comments - FINALNRG ENERGY INCOpen
58481174Texas Public Power Association (TPPA) Comments on PFPTPPAOpen
58481175Targa Resources LLC's Comments and Proposed Redlines in Response to Proposal for Publication of 16 TAC § 25.194Targa Resources LLCOpen
58481176Permian Basin Petroleum Association's Comments in Response to Proposal for Publication of 16 TAC § 25.194Permian Basin Petroleum AssociationOpen
58481177BLACK MOUNTAIN POWER COMMENTS ON PROJECT NO. 58481 PROPOSAL FOR PUBLICATIONBLACK MOUNTAIN POWEROpen
58481178CONSTELLATION ENERGY GENERATION, LLC’S COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194CONSTELLATION ENERGY GENERATION, LLCOpen
58481179ROWAN DIGITAL INFRASTRUCTURE LLC COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194ROWAN DIGITAL INFRASTRUCTURE LLCOpen
58481180Comments on Proposal for Publication on Proposed New 16 TAC §25.194Data Center Coalition (DCC)Open
58481181INITIAL COMMENTS OF CROW HOLDINGSCrow HoldingsOpen
58481182Comments of Texas Electric Cooperatives, Inc.TEXAS ELECTRIC COOPERATIVES, INC.Open
58481183The Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Proposal for Publication of New 16 TAC § 25.194STEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWEROpen
58481184ONCOR ELECTRIC DELIVERY'S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.194ONCOR ELECTRIC DELIVERY COMPANY LLCOpen
58481185ERCOT Steel Mills Comments on Proposal for Publication of New Rule 16 TAC §25.194ERCOT STEEL MILLSOpen
58481186CloudHQ LLC's CommentsCloudHQ LLCOpen
58481187COMMENTS OF EOLIAN, L.P. ON PROPOSED NEW 16 TAC §25.194EOLIAN, L.P.Open
58481188TXOGA Comments on Proposal for Publication on Proposed New 16 TAC §25.194TEXAS OIL & GAS ASSOCIATIONOpen
58481189GVEC's Comments on Proposal for PublicationGUADALUPE VALLEY ELECTRIC COOPERATIVE, INCOpen
58481190Texas Public Policy Foundation's Comments on the Proposed New 16 TAC §25.194Texas Public Policy FoundationOpen
58481191Thor Equities’ Comments on PUCT Staff’s Proposal for PublicationThor Equities LLCOpen
58481192Tesla, Inc. Comments on Proposal for Publication on Proposed New 16 TAC §25.194TESLAOpen
58481193TEXAS INDUSTRIAL ENERGY CONSUMERS’ PROPOSED COMMENTS TO PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194TIECOpen
58481194Joint TSPs’ Comments on Proposal for PublicationWIND ENERGY TRANSMISSION TEXAS, LLCOpen
58481195OPUC’S COMMENTS REGARDING THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.194OPUCOpen
5848119658481 - BKV Initial Comments (04.17.26)BKV CorporationOpen
58481197TNMP’s Comments To Proposal For Publication Of New 16 TAC § 25.194TEXAS-NEW MEXICO POWER COMPANYOpen
58481198Comments of Transmission Service Provider CooperativesBRAZOS ELECTRIC POWER COOPERATIVE, INCOpen
58481199CRUSOE TECHNOLOGIES LLC’S COMMENTS ON STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.194Crusoe Technologies LLCOpen
58481200Vistra's Comments - Project 58481VISTRA CORPORATE SERVICES COMPANYOpen
58481201BRIEF COMMENTS IN SUPPORT OF CHAIRMAN GLEESON'S "GRADUAL ESCALATOR FRAMEWORK" FOR GRADUAL POSTING OF THE $50,000 IA SECURITY POSTINGMISSION POWEROpen
5914229CyrusOne Project No. 59142 Batch Study Considerations and PGRR145CyrusOne, LPOpen
58481153Eolic Development Partners Comments on Proposed New 16 TAC 25.194Eolic Development PartnersOpen
58481154COMMENTS OF DC ENERGY TEXAS, LLCDC Energy Texas, LLCOpen
58481155PROJECT NO 58481 - HIF USA LLC CommentsHIF USA LLCOpen
58481156SATOSHI ENERGY COMMENTS ON STAFF'S PROPOSAL FOR PUBLICATION ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561SATOSHI ENERGY CORP.Open
58481157Letter from the City of Bryan Mayor to the Public Utilities Commission of Texas regarding Large Load Interconnection RulesThe City of Bryan, TexasOpen
58481158COMMENTS OF LANDMARK DEVELOPMENT SERVICES LLC AND ECOPARTNER ALLIANCE ON PROPOSED 16 TAC §25.194LANDMARK DEVELOPMENT SERVICES AND ECOPARTNER ALLIANCEOpen
58481159INFINIUM'S COMMENTS ON LARGE LOAD INTERCONNECTION STANDARDS PROPOSAL FOR PUBLICATIONINFINIUM OPERATIONS, LLCOpen
58481160COMMENTS OF PRIORITY POWER MANAGEMENT LLC ON PROPOSED NEW 16 TAC §25.194PRIORITY POWER MANAGEMENT LLCOpen
58481161Agentic Infrastructure ("Agentic") comments regarding project no.58481Agentic Infrastructure LLCOpen
58481162TCPA Comments on Large Load Interconnection PfP & IssuesTCPAOpen
58481163Electric Hydrogen Comments on Proposed 16 TAC 25.194Electric Hydrogen Co.Open
58481164HUNT ENERGY NETWORK'S COMMENTS ON COMMISSION’S PROPOSAL FOR PUBLICATIONHUNT ENERGY NETWORK L.L.C.Open
58481165Joint Comments of Google LLC, Lancium LLC, and TotalEnergies Renewables USAGOOGLE LLC, LANCIUM LLC, TOTALENERGIES RENEWABLES USAOpen
58481166TEBA's Comments on Commission Staff's Proposal for PublicationTEXAS ENERGY BUYERS ALLIANCEOpen
5914223Eolic Development Partners Comments on Proposed New 16 TAC 25.194Eolic Development PartnersOpen
5914224Joint Comments of Google LLC, Lancium LLC, and Eolic Development LLCGoogle LLC, Lancium LLC, Eolic Development LLCOpen
5914225TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S STAFF MEMO DATED APRIL 12, 2026Tract Holding Company I, LLCOpen
5914226Joint Comments of Stream Data Centers and ProvidentStream Data Centers, L.P. and Provident Corp.Open
5914227Comments in Response to Staff MemoEngine No. 1Open
5914228Agentic Infrastructure Comments regarding 59142 in relations to comments file under 58481Agentic Infrastructure LLCOpen
58481146Suplement filing to comment XYAWFICE - Updated analytic methodology attribution of SVI/TRI addition to researchZack Butler | EnerShield AIOpen
58481147COMMENTS ON THE PROPOSAL FOR PUBLICATIONLOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATIONOpen
58481148COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLCCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCOpen
58481149Cholla, Inc. Supplemental CommentsCholla, Inc.Open
58481150Monarch Energy Comments on Proposed New 16 TAC 25.194MONARCH ENERGYOpen
58481151STACK INFRASTRUCTURE COMMENTS TO PROPOSAL FOR PUBLICATION IN PROJECT NO. 58481STACK InfrastructureOpen
58481152Sierra Club Comments on Proposed Large Load Interconnection StandardsSierra ClubOpen
58481142Project# Rule 25.194 The people demand full and extensive transparency on all water and gas studies, usage records and future plans pertaining to industrial use especially for large scale data centers in bell countySARAH DUNHAMOpen
58481143Supplemental Filing — Environmental Justice Findings, supplement to FCROOJZE and IYFIPWNQZack Butler / EnerShield AIOpen
58481144HUT 8 COMMENTS ON PUC PROPOSAL FOR PUBLICATIONHUT 8 CORPOpen
58481145Intersect Power, LLC's Initial CommentsINTERSECT POWER, LLC.Open
5848227Supplemental Filing — Environmental Justice Findings, supplement to FCROOJZE and IYFIPWNQZack Butler / EnerShield AIOpen
58484114OPUC'S LETTER TO CENTRAL RECORDS- REQUEST TO VOID ITEM NO. 107OPUCOpen
58484115OPUC’S INITIAL COMMENTS ON STAFF OF THE PUBLIC UTILITY COMMISSION OF TEXAS’S MEMORANDUM AND DRAFT EVALUATION OF TRANSMISSION COST RECOVERYOPUCOpen
58481139AEP COMPANIES’ COMMENTS ON COMMISSION’S PROPOSAL FOR PUBLICATIONAEP COMPANIESOpen
58481140CCNG Comments and Redlines for the Proposal for Publication in Project 58481CCNG, Inc.Open
58481141TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S PROPOSAL FOR PUBLICATION TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS (“STANDARDS”)Tract Holding Company I, LLCOpen
5848482Comments on Commission Staff Report Filed Jointly by Base Power Company, Octopus Energy, Rhythm Energy, and Tesla Energy Ventures, LLCRetail Electric Providers for Affordable, Innovative RatesOpen
5848483EDF Comments on Transmission Cost Allocation - PUCT No. 58484ENVIRONMENTAL DEFENSE FUND INCOpen
5848484Texas Public Power Association (TPPA) Comments on Draft Report and RecommendationsTPPAOpen
5848485COMMENTS OF TEXAS ADVANCED ENERGY BUSINESS ALLIANCE IN RESPONSE TO COMMISSION STAFF DRAFT RECOMMENDATIONSTEXAS ADVANCED ENERGY BUSINESS ALLIANCEOpen
5848486Distributed Grid LLC Comments on Transmission Cost Allocation, PUCT No. 58484Distributed Grid LLCOpen
5848487H-E-B and South Texas Electric Cooperative, Inc.'s Joint Comments on Staff's Memorandum and Draft ReportH-E-B, LP AND SOUTH TEXAS ELECTRIC COOPERATIVE, INC.Open
5848488Comments of NRG Energy, Inc. in Response to Staff Memo and Draft Report on Transmission Cost RecoveryNRG ENERGY, INC.Open
5848489Comments on Staff's Report and RecommendationsData Center Coalition (DCC)Open
5848490COMMENTS OF TEXAS ELECTRIC COOPERATIVES, INC.TEXAS ELECTRIC COOPERATIVES, INC.Open
5848491Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Comments on Commission Staff’s Draft Report on Transmission Cost RecoverySTEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWEROpen
5848492LCRA'S COMMENTS ON COMMISSION STAFF'S DRAFT RECOMMENDATIONS FOR TRANSMISSION COST RECOVERYLOWER COLORADO RIVER AUTHORITYOpen
5848493ERCOT Steel Mills Comments on PUCT Staff's Draft Report_Project 58484ERCOT STEEL MILLSOpen
5848494COMMENTS OF CONSERVATIVE TEXANS FOR ENERGY INNOVATIONCONSERVATIVE TEXANS FOR ENERGY INNOVATIONOpen
5848495CPS Energy's Response to Staff's Draft RecommendationsCPS ENERGYOpen
5848496TCPA Comments on Staff Draft Report on Evaluation of Transmission Cost AllocationTCPAOpen
5848497TCA Comments on Draft Report for Transmission Cost RecoveryTEXAS CONSUMER ASSOCIATIONOpen
5848498Texas-New Mexico Power Company's Comments to Commission Staff's March 16, 2026 Request for Public CommentTEXAS-NEW MEXICO POWER COMPANYOpen
5848499GVEC's Comments Regarding Staff's Memo & Draft ReportGUADALUPE VALLEY ELECTRIC COOPERATIVE, INCOpen
58484100Texas REP Coalition Response to PUC Staff Request for CommentsTEXAS REP COALITIONOpen
58484101TEXAS INDUSTRIAL ENERGY CONSUMERS’ COMMENTSTIECOpen
58484102RWE Americas, LLC's Comments to Commission Staff's Draft RecommendationsRWE Americas, LLCOpen
58484103Vistra's Third Set of Comments in Response to Staff's Second Set of QuestionsVISTRA CORPORATE SERVICES COMPANYOpen
58484104Texas Public Policy Foundation's Response to Draft Study on Transmission Cost AllocationTexas Public Policy FoundationOpen
58484105ONCOR ELECTRIC DELIVERY'S COMMENTS ON COMMISSION STAFF'S DRAFT SET OF RECOMMENDATIONSONCOR ELECTRIC DELIVERY COMPANY LLCOpen
58484106CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO COMMISSON STAFF’S REQUEST FOR COMMENTSCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCOpen
58484107VOID SEE ITEM 114OPUCOpen
58484108AEP COMPANIES’ RESPONSE TO COMMISSION STAFF’S DRAFT REPORTAEP COMPANIESOpen
58484109TRACT HOLDING COMPANY I, LLC’S COMMENTS ON THE COMMISSION’S DRAFT RECOMMENDATIONSTract Holding Company I, LLCOpen
58484110Crusoe Technologies LLC's Responses to Staff's Request for Comments on Draft RecommendationsCrusoe Technologies LLCOpen
58484111TEBA Comments on Commission Staff's Draft RecommendationsTEXAS ENERGY BUYERS ALLIANCEOpen
58484112Eolian, L.P.'s Response to Commission Staff's RecommendationsEOLIAN, L.P.Open
58484113Joint Comments of Google LLC and Lancium LLC to PUC Staff Memo and Draft Report in 58484GOOGLE LLC, LANCIUM LLCOpen
5914222Staff MemoPUC RULES & PROJECTSOpen
58481138Supplemental Comments and Request for Public Hearing of Zack Butler / EnerShield AI Regarding Passive Infrastructure Degradation and ERCOT Coincident Peak Demand — Supersedes Item No. 136Zack Butler | EnerShield AI | Blind Mice LabsOpen
5848226Public Comments of Zack Butler / EnerShield AI Regarding Roof Restoration as Eligible Demand Reduction Measure — Cross-Reference to Project 58481 FilingZack Butler | EnerShield AI | Blind Mice LabsOpen
5848480Vitol Inc. comments in response Commission Staff's Draft Evaluation of Transmission Cost RecoveryVITOL INC.Open
5848481Comments from the Sierra Club related to transmission cost allocationSIERRA CLUBOpen
5914221PGRR145 & ERCOT BATCH ZERO CRITERIA CONSIDERATIONSCHAPER ENERGY CONSULTING LLCOpen
58481135Skybox Datacenters, LLC's Initial CommentsSKYBOX DATACENTERS, LLCOpen
58481136Public Comment on SB 6 Large-Load Interconnection Standards — Satellite-Based Evidence of Data Center Roof Thermal Degradation and Grid Demand Impact (403 TX Facilities, 27M SF, $101M Annual Energy Waste, 247M Gallons Avoidable Water)Zachary Butler, Blind Mice LabsOpen
58481137Supplemental Filing — Revised 2-Page Summary (Corrects and supersedes initial filing FCROOJZE dated 4/10/2026)Zachary Butler, Blind Mice LabsOpen
5848479City of Houston's CommentsCITY OF HOUSTONOpen
5914219ONCOR ELECTRIC DELIVERY COMPANY LLC’S COMMENTS ON ERCOT’S PGRR 145ONCOR ELECTRIC DELIVERY COMPANY LLCOpen
5914220ERCOT LARGE LOAD BATCH STUDY UPDATEERCOTOpen
58481134Vistra Corp.'s Additional Comments on Planning Guide Revision Request 145 for Project 58481VISTRA CORP.Open
5914218Vistra Corp.'s Comments on Planning Guide Revision Request 145 for Project 59142VISTRA CORP.Open
584826ERCOT Steel Mills Comments_Project 58482_4.8.2026ERCOT STEEL MILLSOpen
584827TCPA’S RESPONSES TO STAFF’S QUESTIONS REGARDING THE LARGE LOAD DEMAND MANAGEMENT SERVICETCPAOpen
584828EDF Comments on the Large Load Demand Management Service - PUCT No. 58482ENVIRONMENTAL DEFENSE FUND INCOpen
584829Texas Public Power Association (TPPA) Response to Questions for CommentTPPAOpen
5848210DCC Comments Regarding the Large Load Demand Management ServiceData Center CoalitionOpen
5848211RESPONSE TO QUESTIONS FOR COMMENTLOWER COLORADO RIVER AUTHORITYOpen
5848212Reply to questions on Large Loads Demand Management SystemSierra ClubOpen
5848213RESPONSES OF TEXAS ELECTRIC COOPERATIVES, INC.TEXAS ELECTRIC COOPERATIVES, INC.Open
5848214NRG Energy, Inc.'s Comments in Response to Staff's QuestionsNRG ENERGY, INC.Open
5848215VOLTUS RESPONSE TO PUCT STAFF'S QUESTIONS ON PROPOSED LARGE LOAD DEMAND MANAGEMENT SERVICEVoltus Inc.Open
5848216Texas Energy Buyers Alliance Response to Commission Staff QuestionsTEXAS ENERGY BUYERS ALLIANCEOpen
5848217TAEBA Initial Question Responses Regarding the Large Load Demand Management ServiceTEXAS ADVANCED ENERGY BUSINESS ALLIANCEOpen
5848218ONCOR ELECTRIC DELIVERY’S RESPONSE TO COMMISSION STAFF’S FIRST SET OF QUESTIONS FOR COMMENTSONCOR ELECTRIC DELIVERY COMPANY LLCOpen
5848219TEXAS INDUSTRIAL ENERGY CONSUMERS’ COMMENTSTIECOpen
5848220Enchanted Rock, LLC's Comments to Commission Staff's March 23 Memo and Questions for CommentENCHANTED ROCK, LLCOpen
5848221AEP Texas Inc.’s Responses to Commission Staff’s Memo and Questions for CommentAEP TEXAS INC.Open
5848222ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO COMMISSION STAFF’S LIST OF QUESTIONSERCOTOpen
5848223Vistra Corporate Services Company's Comments in Response to Commission Staff's QuestionsVISTRA CORPORATE SERVICES COMPANYOpen
5848224EOLIAN, L.P.'s Comments to Commission Staff's March 23, 2026 Memo and Questions for CommentEOLIAN, L.P.Open
5848225CyrusOne, LP Comments in Response to Commission Staff's QuestionsCyrusOne, LPOpen
58481133Cholla comments on Proposal for PublicationCholla, Inc.Open
584825IMM Comments on the Large Load Demand Management Service 58482POTOMAC ECONOMICSOpen
58481132CPV Comments on Proposal for Publication of 16 TAC §25.194Competitive Power VenturesOpen
58481131Project No. 58481 PFP Comments and Proposed Draft RedlinesSCHAPER ENERGY CONSULTING LLCOpen
5848478A model and approach to the challenge posed by optimal power systems planningRichard O'NeillOpen
58481130Comments on Proposal for Publication of 16 TAC §25.194 – Project No. 58481Jason BusterOpen
5914217ERCOT LARGE LOAD BATCH STUDY UPDATEERCOTOpen
58481129PUC Project No. 58481 - Interconnection Agreement Standards Applicability to Batch ZeroSCHAPER ENERGY CONSULTING LLCOpen
58481128Cipher Digital Comments on PUC Docket 58481Cipher DigitalOpen
5847966ORDER ADOPTING NEW 16 TAC §25.205PUC OPDMOpen
5847967Texas Register Acknowledgement of Receipt-Proposal for AdoptionRULES & PROJECTSOpen
584824OPUC NOTICE OF PARTICIPATION LETTEROPUCOpen
584822Staff Memo_Restyle RequestPUC RULES & PROJECTSOpen
584823Staff Memo and Questions for Comment w/April 8 DeadlinePUC RULES & PROJECTSOpen
5847965Vistra Corp.'s Comments on Planning Guide Revision Request 145VISTRA CORP.Open
58481127Vistra Corp.'s Comments on Planning Guide Revision Request 145 for Project 58481VISTRA CORP.Open
5914216Vistra Corp.'s Comments on Planning Guide Revision Request 145 for Project 59142VISTRA CORP.Open
58481125Monarch Energy Additional Comments on Proposal for PublicationMONARCH ENERGYOpen
58481126Serena Power CommentsSerena PowerOpen
58481124Staff Memo w/MS Word Version of PFPPUC RULES & PROJECTSOpen
5848477Staff Memo and Draft Report w/April 13 Comment DeadlinePUC RULES & PROJECTSOpen
58481122PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.194PUC OPDMOpen
58481123Texas Register Acknowledgement of Receipt - Comments Due 04/17/2026PUC RULES & PROJECTSOpen
5847964CHAIRMAN GLEESON MEMORANDUMPUC OPDMOpen
58481116CIPHER DIGITAL INC. COMMENTS TO STAFF PROPOSED PROPOSAL FOR PUBLICATIONCipher DigitalOpen
58481117EDGECONNEX COMMENTS TO STAFF'S PROPOSED PROPOSAL FOR PUBLICATIONEdgeConnexOpen
58481118CHAIRMAN GLEESON MEMORANDUMPUC OPDMOpen
58481119Engine 1's Comments on PUCT Staff's Proposal for PublicationEngine 1Open
58481120Hut 8 Comments on Staff's Proposal for PublicationHut 8 CorpOpen
58481121Nightpeak Energy Comments on Staff's Proposal for PublicationNightpeak EnergyOpen
58481115JOINT REDLINES FOR THE PROPOSED PROPOSAL FOR PUBLICATIONGOOGLE LLC, LANCIUM LLCOpen
5914215PUC PROJECT NO. 59142 - BATCH STUDY CONSIDERATIONS AND PGRR145SCHAPER ENERGY CONSULTING LLCOpen
5847963OM Item No. 43 - Staff Memo with Proposed Redline ChangesPUC RULES & PROJECTSOpen
5914214ERCOT LARGE LOAD BATCH STUDY UPDATEERCOTOpen
58481112IREN Comments on Proposed PFPIRENOpen
58481113Monarch Energy Comments on Proposal for PublicationMonarch Energy Development LLCOpen
58481114Provident, Inc. Comments on Proposed Proposal for PublicationProvident, Inc.Open
58481111Speed to Power Concept Paper for ERCOT Large Load Batch Study ProceedingsLuminary Strategies,LLCOpen
58481110Google and Lancium Joint Comments to Proposed PFPGoogle LLC, Lancium LLCOpen
58481109SCHAPER ENERGY ENERGY CONSULTING COMMENTS TO STAFF DISCUSSION DRAFT 16 (TAC) §25.194 DATED FEBRUARY 13, 2026SCHAPER ENERGY CONSULTING LLCOpen
58481108Comments regarding Fee recommendation by StaffCholla, Inc.Open
5847962OM Item No. 26 - (Staff Recommendation) Order Adopting New §25.205PUC RULES & PROJECTSOpen
58481107OM Item No. 27 - Staff Memo & PFP w/March 27 Comment DeadlinePUC RULES & PROJECTSOpen
5914213ERCOT LARGE LOAD BATCH STUDY UPDATEERCOTOpen
58481106Comments of Leaptran, Inc.Leaptran, Inc.Open
5848059Texas Register Acknowledgement of Receipt-Proposal for AdoptionPUC RULES & PROJECTSOpen
5848058ORDER ADOPTING NEW 16 TAC § 25.370PUC OPDMOpen
5914212TBC ERCOT Large Load Interconnection Batch Study CommentsTEXAS BLOCKCHAIN COUNCILOpen
5914211ERCOT LARGE LOAD BATCH STUDY PROCESS UPDATEERCOTOpen
5848057OM Item No. 33 - Staff Memo with Proposed Redline ChangesPUC RULES & PROJECTSOpen
591429OPUC NOTICE OF PARTICIPATION LETTEROPUCOpen
591421075kW Sculptawave Infrastructure Standard and Sovereign Disclosure by Larry Power Versatility Martin.Formal Notice of the 75kW Ready State Technology for Large Load InterconnectionLARRY MARTINOpen
591428ERCOT LARGE LOAD BATCH STUDY PROCESS DRAFT FRAMEWORK PRESENTATIONSERCOTOpen
591427OPEN LETTER TO THE COMMISSION REGARDING ERCOT'S INTERCONNECTION PROCESS FOR LARGE LOADSRose City Partners, Schaper Energy Consulting, Crusoe Energy Systems, Outlaw Ventures, Solomon Data Systems, Eolic Development Partners, Zero Emission Grid, Juvo Energy, Belisari, and V-WireOpen
5848056COMMISSIONER HJALTMAN MEMORANDUMPUC OPDMOpen
5848055Project No. 58480 _ Schaper Energy Consulting _ Comments Concerning ERCOT Proposed Load Forecasting RulesSCHAPER ENERGY CONSULTING LLCOpen
591426LETTER RE ERCOT LARGE LOAD BATCH STUDY PROCESS UPDATEERCOTOpen
5848053OM Item No. 10 - (Staff Recommendation) Order Adopting New §25.370PUC RULES & PROJECTSOpen
5848054ERCOT’S PROPOSED COMPLIANCE PLAN FOR INCLUDING LARGE LOADS IN THE LOAD FORECAST FOR THE 2026 REGIONAL TRANSMISSION PLANERCOTOpen
58481105Comments of Texas-New Mexico Power CompanyTEXAS-NEW MEXICO POWER COMPANYOpen
58481104Tract Post-Workshop Comments on Staff's Second Discussion DraftTractOpen
5848183SATOSHI ENERGY COMMENTS ON STAFF'S SECOND DISCUSSION DRAFT ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561SATOSHI ENERGY CORP.Open
5848184CRUSOE ENERGY SYSTEMS LLC’S COMMENTS ON STAFF’S SECOND DRAFT DISCUSSION RULE 16 TAC § 25.194CRUSOE ENERGY SYSTEMS LLCOpen
5848185TEXAS INDUSTRIAL ENERGY CONSUMERS’ COMMENTSTIECOpen
5848186Existing load increases are inherently not speculativeCormintOpen
5848187Google and Lancium Joint Comments to STaff Questions and 2nd Discussion DraftGOOGLE LLC, LANCIUM LLCOpen
5848188POST-WORKSHOP COMMENTS OF TEXAS ELECTRIC COOPERATIVES, INC.TEXAS ELECTRIC COOPERATIVES, INC.Open
5848189COMMENTS OF SERENA ENERGYSERENA ENERGYOpen
5848190Comments of CenterPoint Energy Houston Electric, LLCCENTERPOINT ENERGY HOUSTON ELECTRICOpen
5848191Further comments from Sierra Club on Large Load Interconnection StandardsSierra ClubOpen
5848192ETT’S COMMENTS ON STAFF’S 2ND DISCUSSION DRAFTELECTRIC TRANSMISSION TEXAS, LLCOpen
5848193CPS Energy's Response to Questions for CommentCPS ENERGYOpen
5848194Comments on Staff's Second Draft Discussion Rule in 16 TAC 25.194ROWAN DIGITAL INFRASTRUCTURE LLCOpen
5848195ONCOR ELECTRIC DELIVERY’S COMMENTS ON COMMISSION STAFF’S SECOND RULE 25.194 DISCUSSION DRAFTONCOR ELECTRIC DELIVERY COMPANY LLCOpen
5848196BLACK MOUNTAIN POWER COMMENTS ON PROJECT NO. 58481BLACK MOUNTAIN POWEROpen
5848197AEP TEXAS' COMMENTS ON STAFF’S SECOND DISCUSSION DRAFTAEP TEXAS INC.Open
5848198Additional Comment's on Second Discussion DraftData Center CoalitionOpen
5848199Project No. 58481_Schaper Energy Consulting_Supplemental CommentsSCHAPER ENERGY CONSULTING LLCOpen
58481100OPUC’S COMMENTS ON STAFF’S SECOND SET OF QUESTIONS FOR PUBLIC COMMENT AND SECOND DISCUSSION DRAFT RELATED TO NEW 16 TAC § 25.194OPUCOpen
58481101City of Red Oak Comments on the 2nd Discussion DraftCITY OF RED OAKOpen
58481102Feedback Post January 9, 2026 PUC Hearing Regarding PUCT Project No. 58481 (Large Load Interconnection Standards)TEXAS BLOCKCHAIN COUNCILOpen
58481103Comments of Cholla on Revised Draft Rule.Cholla, Inc.Open
591425LETTER RE FEBRUARY 3 2026 BATCH STUDY WORKSHOPERCOTOpen
5848476CenterPoint Energy Houston Electric Second Updated Response to Commission Staff’s Request for CommentsCENTERPOINT ENERGY HOUSTON ELECTRICOpen
591424LETTER RE ERCOT LARGE LOAD BATCH STUDY PROCESS UPDATEERCOTOpen
5848182Staff Memo and January 9 Workshop Agenda w/AttachmentsPUC RULES & PROJECTSOpen
5848141NCTCOG Comments on Draft 16 TAC §25.194 Project No 58481NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTSOpen
5848142TCPA Comments on Staff Questions & Discussion DraftTCPAOpen
5848143Comments of Skybox Datacenters LLC to 58481 Large Load Interconnection StandardsSkybox Datacenters LLCOpen
5848144Priority Power Comments on Draft 16 TAC §25.194 Project No 58481PRIORITY POWER MANAGEMENT, LLCOpen
5848145Project No. 58481 – Rulemaking to Implement Large Load Interconnection Standards (16 TAC §25.194) Comment LetterTEXAS BLOCKCHAIN COUNCILOpen
5848146COMMENTS OF MONARCH ENERGY DEVELOPMENT LLC ON STAFF’s QUESTIONS AND DISCUSSION DRAFT OF NEW 16 TAC §25.194MONARCH ENERGY DEVELOPMENT LLCOpen
5848147Dallas County Public Works Comments on Implementation of SB 6Dallas County Public WorksOpen
5848148Comments of Texas Electric Cooperatives, Inc.Texas Electric Cooperatives, Inc.Open
5848149Comments of CenterPoint Energy Houston Electric, LLCCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCOpen
5848150NRG Energy, Inc.'s Comments on Staff's Discussion DraftNRG ENERGY, INC.Open
5848151Wise Energy Resources Comments on Discussion Draft and QuestionsWise Energy ResourcesOpen
5848152BASF Comments on Rule Project 58481BASFOpen
5848153RESPONSE TO QUESTIONS FOR COMMENT AND DRAFT NEW 16 TAC § 25.194LCRA TRANSMISSION SERVICES CORPORATIONOpen
5848154P.58481 - Dow Comments.pdfTHE DOW CHEMICAL COMPANY AND AFFILIATESOpen
5848155Comments on Staff new Draft 16 TAC §25.194ApertureOpen
5848156Hood County Clean Air Coalition Comment for Rulemaking to Implement Large Load Interconnection StandardsHood County Clean Air CoalitionOpen
5848157ERCOT Steel Mills' Comments on Staff's Discussion Draft for Project No. 58481ERCOT STEEL MILLSOpen
5848158Comments of Golden Spread Electric CooperativeGolden Spread Electric Cooperative, Inc.Open
5848159Texas Public Power Association (TPPA) Comments on Discussion DraftTPPAOpen
5848160ROWAN DIGITAL INFRASTRUCTURE LLC REPLY COMMENTSROWAN DIGITAL INFRASTRUCTURE LLCOpen
5848161ONCOR ELECTRIC DELIVERY'S COMMENTS ON COMMISSION STAFF'S RULE 25.194 DISCUSSION DRAFTONCOR ELECTRIC DELIVERY COMPANY LLCOpen
5848162Provident Inc. comments on staff discussion draftProvident Inc.Open
5848163TEXAS OIL & GAS ASSOCIATION'S COMMENTS ON DISCUSSION DRAFT 16 TAC §25.194TEXAS OIL & GAS ASSOCIATIONOpen
5848164OFFICE OF PUBLIC UTILITY COUNSEL’S COMMENTS ON DISCUSSION DRAFT AND QUESTIONS FOR PUBLIC COMMENTS RELATED TO NEW 16 TAC § 25.194OPUCOpen
5848165TEXAS INDUSTRIAL ENERGY CONSUMERS’ COMMENTSTIECOpen
5848166DCC's Comments on the Discussion Draft (Project 58481)Data Center CoalitionOpen
5848167INFINIUM'S COMMENTS ON LARGE LOAD INTERCONNECTION STANDARDS DISCUSSION DRAFTINFINIUM OPERATIONS, LLCOpen
5848168Eolian, L.P.'s Second Set of Comments on RulemakingEolian, L.P.Open
5848169SPLIGHT COMMENTS ON STAFF'S DRAFT DISCUSSION RULE § 25.194Splight Inc.Open
5848170Comments of Cross Texas Transmission, LLCCROSS TEXAS TRANSMISSION, LLCOpen
5848171AEP TEXAS INC.’S COMMENTS ON STAFF DISCUSSION DRAFTAEP TEXAS INC.Open
5848172Targa Resources LLC's Comments in Response to Commission Staff's Discussion DraftTarga Resources LLCOpen
5848173Texas-New Mexico Power Company’s Comments To Commission Staff’s Questions For Comment On Draft New 16 Tac § 25.194TEXAS-NEW MEXICO POWER COMPANYOpen
5848174Occidental Permian, LTD. CommentsOCCIDENTAL PERMIAN LTDOpen
5848175CRUSOE ENERGY SYSTEMS LLC’S COMMENTS ON STAFF’S DRAFT DISCUSSION RULE 16 TAC § 25.194CRUSOE ENERGY SYSTEMS LLCOpen
5848176ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS ON DISCUSSION DRAFTERCOTOpen
5848177SATOSHI ENERGY COMMENTS ON DRAFT NEW 16 TAC §25.194 ON PROJECT NO. 58481, RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561SATOSHI ENERGY CORP.Open
5848178TEBA's Comments on Commission Staff's Questions and Discussion DraftTEXAS ENERGY BUYERS ALLIANCEOpen
5848179BLACK MOUNTAIN POWER COMMENTS ON PROJECT NO. 58481 DISCUSSION DRAFTBLACK MOUNTAIN POWEROpen
5848180Exxon Mobil Corporation comments on 58481 Discussion DraftExxon Mobil CorporationOpen
5848181SOLUNA DIGITAL’S SUPPORTIVE COMMENTS FOR COMMENTS SUBMITTED BY SATOSHI ENERGY ON STAFF'S DISCUSSION DRAFT NEW 16 TAC §25.194Soluna DigitalOpen
591423PROJECT NO. 59142_REVIEW OF ERCOT'S INTERCONNECTION PROCESSES FOR LARGE LOADS_SCHAPER ENERGY CONSULTING LLC COMMENTSSCHAPER ENERGY CONSULTING LLCOpen
5848136Comments on proposed staff draft on large load interconnection standards.SIERRA CLUBOpen
5848137Digital Power Network comments on PUCT PROJECT NO. 58481.Digital Power NetworkOpen
5848138Comments from Sierra Club on Large Load Interconnection StandardsSIERRA CLUBOpen
5848139Freeport LNG Development, L.P. comments to address new proposed §25.194(l).FREEPORT LNG DEVELOPMENT, L.P.Open
5848140Joint Comments of Google LLC and Lancium LLC to 58481 Large Load Interconnection StandardsGOOGLE LLC, LANCIUM LLCOpen
591422Joint Comments of Google LLC and Lancium LLC as it pertains to ERCOT's Large Load Process ReformsGOOGLE LLC, LANCIUM LLCOpen
5848135Cholla Comments on Draft Rule AmendedCholla Petroleum, Inc.Open
591421CONTROL NUMBER REQUESTPUC EXECUTIVE DIRECTOROpen
5848133Notice of January 9 WorkshopPUC RULES & PROJECTSOpen
5848134Cholla Comments on Draft RuleCholla Petroleum, Inc.Open
5848132SCHAPER ENERGY CONSULTING LLC RESPONSE TO PROJECT NO. 58481, COMMENTS TO STAFF’s QUESTIONS AND DRAFT 16 TAC §25.194Schaper Energy Consulting LLCOpen
5848131Discussion Draft w/12.19 Comment DeadlinePUC RULES & PROJECTSOpen
5848473Void Letter for Item 72POTOMAC ECONOMICSOpen
5848474IMM Comments on Transmission Cost Allocation P-58484POTOMAC ECONOMICSOpen
5848475Public Comment on Project No. 58484 – Opposition to Residential Cost-Shifting via 4CPKenny MitchellOpen
5848446AARP Comments on No. #58484AARP TexasOpen
5848447COMMENTS OF VITOL INC. PROJECT NO. 58484: EVALUATION OF TRANSMISSION COST RECOVERYVITOL INC.Open
5848448Georgetown's Comments on Project 58484: Evaluation of Transmission Cost RecoveryCITY OF GEORGETOWNOpen
5848449Texas Public Power Association (TPPA) Comments on QuestionsTPPAOpen
5848450Comments and answers to staff questionsSierra ClubOpen
5848451Enchanted Rock, LLC's Reply Comments on Commission Questions Regarding Transmission Cost RecoveryENCHANTED ROCK, LLCOpen
5848452ONCOR'S RESPONSE TO COMMISSION STAFF’S SECOND SET OF QUESTIONS FOR COMMENTSONCOR ELECTRIC DELIVERY COMPANY LLCOpen
5848453LCRA AND LCRA TSC'S RESPONSE TO COMMISSION STAFF'S SECOND SET OF QUESTIONS FOR COMMENTLOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATIONOpen
5848454Joint Responses to Staff Questions of H-E-B, LP and South Texas Electric Cooperative, Inc.H-E-B LP and South Texas Electric Cooperative, Inc.Open
5848455Comments of NRG Energy, Inc. in Response to Staff's Second Set of Questions on Transmission Cost RecoveryNRG ENERGY, INC.Open
5848456Comments of Base Power Company on Staff Second Set of Questions for CommentBASE POWER COMPANYOpen
5848457Responses of Texas Electric Cooperatives, Inc.Texas Electric Cooperatives, Inc.Open
5848458TEXAS INDUSTRIAL ENERGY CONSUMERS’ COMMENTSTIECOpen
5848459DCC's Comments in Response to Staff's Second Set of QuestionsData Center CoalitionOpen
5848460TCA Comments on Staff QuestionsTEXAS CONSUMER ASSOCIATIONOpen
5848461Texas Energy Association for Marketers' Response to Questions for CommentTEXAS ENERGY ASSOCIATION FOR MARKETERSOpen
5848462TEBA's Comments on Project 58484TEXAS ENERGY BUYERS ALLIANCEOpen
5848463Vistra's Comments in Response to Staff's Second Set of QuestionsVISTRA CORPORATE SERVICES COMPANY LLCOpen
5848464CPS Energy's Comments in Response to Second Set of Questions.CPS ENERGYOpen
5848465ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSE TO STAFF QUESTIONSERCOTOpen
5848466COMMENTS OF CONVERGENT ENERGY AND POWER IN RESPONSE TO PUC STAFF’S REQUEST FOR COMMENTS ON TRANSMISSION COST RECOVERYConvergent Energy and PowerOpen
5848467TAEBA Response to Staff's Second Set of Questions Proj. No. 58484TEXAS ADVANCED ENERGY BUSINESS ALLIANCEOpen
5848468CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC’S RESPONSES TO COMMISSON STAFF’S REQUEST FOR COMMENTSCENTERPOINT ENERGY HOUSTON ELECTRICOpen
5848469RESPONSES TO COMMISSION STAFF’S SECOND SET OF QUESTIONS FOR COMMENTSAEP TEXAS INC.Open
5848470OPUC’S COMMENTS ON THE SECOND SET OF QUESTIONS FOR PUBLIC COMMENT TO ATTACHMENTS A AND B RELATING TO THE EVALUATION OF TRANSMISSION COST RECOVERYOPUCOpen
5848471ERCOT Steel Mills' Comments on Commission Staff Questions and Draft Report Outline for Project No. 58484 – Evaluation of Transmission Cost RecoveryERCOT STEEL MILLSOpen
5848472VOID SEE ITEM 73POTOMAC ECONOMICSOpen
5848444Letter to Void Item #41CENTERPOINT ENERGY HOUSTON ELECTRICOpen
5848445CEHE’s Updated Response to Commission Staff’s Request for Information Issued October 17, 2025, Regarding Wholesale Transmission Service ChargesCENTERPOINT ENERGY HOUSTON ELECTRICOpen
5848443SUPPLEMENTAL RESPONSE TO COMMISSION STAFF’S REQUEST FOR INFORMATION ISSUED ON OCTOBER 17, 2025 RELATED TO WHOLESALE TRANSMISSION SERVICE CHARGESAEP TEXAS INC.Open
5848441VOID SEE ITEM 44CENTERPOINT ENERGY HOUSTON ELECTRIC, LLCOpen
5848442ONCOR'S RESPONSE TO STAFF'S REQUEST FOR INFORMATION RELATED TO WHOLESALE TRANSMISSION SERVICE CHARGESONCOR ELECTRIC DELIVERY COMPANY LLCOpen
5848440TNMP Response to Staff Request for InformationTEXAS-NEW MEXICO POWER COMPANYOpen
5848439RESPONSE TO COMMISSION STAFF’S REQUEST FOR INFORMATION ISSUED ON OCTOBER 17, 2025 RELATED TO WHOLESALE TRANSMISSION SERVICE CHARGESAEP TEXAS INC.Open
5847942TCPA Reply CommentsTCPAOpen
5847943CTEI Reply Comments on Proposed 16 TAC 25.505Conservative Texans for Energy InnovationOpen
5847944Texas Public Power Association (TPPA) Reply CommentsTPPAOpen
5847945REPLY COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLCCENTERPOINT ENERGY HOUSTON ELECTRICOpen
5847946ONCOR ELECTRIC DELIVERY’S REPLY COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 AND ACCOMPANYING QUESTIONSONCOR ELECTRIC DELIVERY COMPANY LLCOpen
5847947Vistra Reply CommentsVISTRA CORP.Open
5847948Reply Comments on Co-Location of Large Loads (58479)SIERRA CLUBOpen
5847949Comments of Texas Electric Cooperatives, Inc.TEXAS ELECTRIC COOPERATIVES, INC.Open
5847950Reply Comments of TSSATexas Solar+Storage AssociationOpen
5847951TEXAS INDUSTRIAL ENERGY CONSUMERS’ REPLY COMMENTSTIECOpen
5847952CALPINE CORPORATION’S REPLY COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.205CALPINE CORPORATIONOpen
5847953TAEBA Project No. 58479 Reply CommentsTEXAS ADVANCED ENERGY BUSINESS ALLIANCEOpen
5847954CRUSOE ENERGY SYSTEMS LLC REPLY COMMENTSCRUSOE ENERGY SYSTEMS LLCOpen
5847955ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REPLY COMMENTS REGARDING PROPOSED 16 TAC § 25.205ERCOTOpen
5847956Texas-New Mexico Power Company’s Reply Comments Regarding Proposal for PublicationTEXAS NEW MEXICO POWER COMPANYOpen
5847957OPUC’S REPLY COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205OPUCOpen
5847958ENCHANTED ROCK, LLC REPLY COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205ENCHANTED ROCK, LLCOpen
5847959Eolian's Reply Comments on Proposal for PublicationEOLIAN, L.P.Open
5847960Data Center Coalition's Reply CommentsData Center Coalition (DCC)Open
5847961CyrusOne Reply Comments on Project No 58479. RULEMAKING FOR NET METERING ARRANGEMENT INVOLVING A LARGE LOAD CO-LOCATED WITH AN EXISTING GENERATION RESOURCE UNDER PURA § 39.169CyrusOneOpen
5848039REPLY COMMENTSCENTERPOINT ENERGY HOUSTON ELECTRIC, LLCOpen
5848040ONCOR ELECTRIC DELIVERY’S REPLY COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.370ONCOR ELECTRIC DELIVERY COMPANY LLCOpen
5848041Reply comments on large load forecasting.SIERRA CLUBOpen
5848042TCPA REPLY COMMENTS TO THE PFP REGARDING LARGE LOAD FORECASTING CRITERIATCPAOpen
5848043Joint Reply Comments of Wind Energy Transmission Texas, LLC; Cross Texas Transmission, LLC; and Lone Start Transmission, LLC on the Proposal for Publication of New 16 TAC § 25.370WIND ENERGY TRANSMISSION LLCOpen
5848044OCSC and TCAP's Reply CommentsSTEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWEROpen
5848045REPLY COMMENTSLOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATIONOpen
5848046TEXAS INDUSTRIAL ENERGY CONSUMERS’ REPLY COMMENTSTIECOpen
5848047ROWAN DIGITAL INFRASTRUCTURE LLC REPLY COMMENTSRowan Digital Infrastructure LLCOpen
5848048OPUC’S REPLY COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.370OPUCOpen
5848049CRUSOE ENERGY SYSTEMS LLC REPLY COMMENTSCRUSOE ENERGY SYSTEMS LLCOpen
5848050ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S REPLY COMMENTS REGARDING PROPOSED 16 TAC § 25.370ERCOTOpen
5848051Eolian L.P.'s Reply Comments on Proposal for PublicationEOLIAN, L.P.Open
5848052Data Center Coalition's Reply CommentsData Center Coalition (DCC)Open
5848438Staff Memo Extending Comment Deadline to 11/25PUC RULES & PROJECTSOpen
5848038REPLY COMMENTSAEP TEXAS INC.Open
5848437Staff Memo & Nov. 10 Workshop Agenda w/Nov. 21 Written Comment DeadlinePUC RULES & PROJECTSOpen
5848436Staff Memo & Notice of 11/10 WorkshopPUC RULES & PROJECTSOpen
5848037TXOGA Comments PUC Large Load Forecast - SB 6 _ PROJECT NO. 58480APPLICATION OF RPOWER RETAIL LLC TO RELINQUISH ITS RETAIL ELECTRIC PROVIDER CERTIFICATEOpen
5847916Comments and responses to questions from the Sierra Club in Project 58479SIERRA CLUBOpen
5847917SPLIGHT COMMENTS ON STAFF'S DRAFT DISCUSSION RULE § 25.205Splight Inc.Open
5847918Texas Public Power Association (TPPA) Comments on PFPTPPAOpen
5847919CTEI Initial Comments on Proposed 25 TAC 25.205Conservative Texans for Energy InnovationOpen
5847920VOID SEE ITEM 35TCPAOpen
5847921Initial Comments of the Texas Advanced Energy Business Alliance on Commission Staff's Draft Rule §25.205TEXAS ADVANCED ENERGY BUSINESS ALLIANCEOpen
5847922TEXAS INDUSTRIAL ENERGY CONSUMERS’ PROPOSED COMMENTS TO DRAFT RULE 25.504TIECOpen
5847923SATOSHI'S COMMENTS ON STAFF'S PROPOSAL FOR PUBLICATIONSATOSHI ENERGY CORP.Open
5847924EDGECONNEX COMMENTS ON COMMISSION STAFF'S DRAFT RULE 16 TAC § 25.205EdgeConneXOpen
5847925CALPINE CORPORATION’S COMMENTS ON COMMISSION STAFF’S PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.205CALPINE CORPORATIONOpen
5847926ONCOR ELECTRIC DELIVERY’S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205 AND ACCOMPANYING QUESTIONSONCOR ELECTRIC DELIVERY COMPANY LLCOpen
5847927OFFICE OF PUBLIC UTILITY COUNSEL’S INITIAL COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205OPUCOpen
5847928Comments of Texas Electric Cooperatives, Inc.Texas Electric Cooperatives, Inc.Open
5847929LCRA RESPONSE TO PFPLOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATIONOpen
5847930Vistra Corp.'s CommentsVISTRA CORP.Open
5847931CORRECTION: RESPONSE TO STAFF QUESTIONS & RECOMMENDATIONS FOR PFPTCPAOpen
5847932COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.505ELECTRIC TRANSMISSION TEXAS, LLCOpen
5847933COMMENTS OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLCCENTERPOINT ENERGY HOUSTON ELECTRICOpen
5847934AEP TEXAS’ COMMENTS ON PROPOSAL FOR PUBLICATIONAEP TEXAS INC.Open
5847935REQUEST TO VOID ITEM 20, FILED IN ERRORTCPAOpen
5847936ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSES TO COMMISSION QUESTIONS AND COMMENTS REGARDING PROPOSED 16 TAC § 25.205ERCOTOpen
5847937Eolian, L.P.'s Comments on the Proposal for Publication and Request for HearingEOLIAN, L.P.Open
5847938Data Center Coalition's CommentsData Center CoalitionOpen
5847939Texas-New Mexico Power Company’s Comments to Commission Staff’s Questions and Comments on Proposal For PublicationTEXAS- NEW MEXICO POWER COMPANYOpen
5847940Comments of TSSA on Project 58479Texas Solar+Storage AssociationOpen
5847941Comments attached for Project 58497, Net Metering ArrangementsOnward Energy Holdings, LLCOpen
5848010SCHAPER ENERGY CONSULTING LLC RESPONSE TO PROJECT NO. 58480; ERCOT LARGE LOAD FORECASTING CRITERIA UNDER PROPOSED 16 TAC §25.370Schaper Energy Consulting LLCOpen
5848011Comments on proposed rulemaking on large load forecasting by ERCOTSierra ClubOpen
5848012VOID SEE ITEM 13ENVIRONMENTAL DEFENSE FUND INCOpen
5848013Void letter for 58480-12ENVIRONMENTAL DEFENSE FUND INCOpen
5848014EDF comments on large load forecast proposed ruleENVIRONMENTAL DEFENSE FUND INCOpen
5848015ERCOT STEEL MILLS’ COMMENTS ON PROJECT NO. 58480 - ERCOT LARGE LOAD FORECASTING CRITERIAERCOT STEEL MILLSOpen
5848016Targa Resources LLC's Comments to Staff Recommendation for Proposal for Publication of New 16 TAC §25.370Targa Resources LLCOpen
5848017NRG Energy, Inc.'s Comments on the Proposed RuleNRG ENERGY, INC.Open
5848018Texas Public Policy Foundation Comments on Proposal for Publication of New 16 TAC §25.370Texas Public Policy FoundationOpen
5848019Texas Public Power Association (TPPA) Comments on PFPTPPAOpen
5848020OCSC and TCAP's Comments on Proposed Large Load Forecasting CriteriaTHE STEERING COMMITTEE OF CITIES SERVED BY ONCOR (CITIES)Open
5848021SCHAPER ENERGY CONSULTING LLC SUPPLEMENTAL RESPONSE TO STAFF’s QUESTIONS ON PROJECT NO. 58480; ERCOT LARGE LOAD FORECASTING CRITERIA UNDER PROPOSED 16 TAC §25.370Schaper Energy Consulting LLCOpen
5848022TCPA Comments and Recommendations on PfPTCPAOpen
5848023TEXAS INDUSTRIAL ENERGY CONSUMERS’ PROPOSED COMMENTS TO DRAFT RULE 25.504TIECOpen
5848024OFFICE OF PUBLIC UTILITY COUNSEL’S COMMENTS ON PROPOSAL FOR PUBLICATION OF NEW 16 TAC § 25.370OPUCOpen
5848025TEBA's Comments on Project No. 58480 Proposal for PublicationTEXAS ENERGY BUYERS ALLIANCEOpen
5848026ONCOR ELECTRIC DELIVERY’S COMMENTS ON THE PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.370ONCOR ELECTRIC DELIVERY COMPANY LLCOpen
5848027CenterPoint Energy Houston Electric CommentsCENTERPOINT ENERGY HOUSTON ELECTRICOpen
5848028Comments of Texas Electric Cooperatives, Inc.Texas Electric Cooperatives, Inc.Open
5848029AEP TEXAS’ COMMENTS ON PROPOSAL FOR PUBLICATIONAEP TEXAS INC.Open
5848030LCRA AND LCRA TSC COMMENTSLOWER COLORADO RIVER AUTHORITY AND LCRA TRANSMISSION SERVICES CORPORATIONOpen
5848031Comments from the City of Red Oak on SB6 Rule Making Project 58480CITY OF RED OAKOpen
5848032ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S COMMENTS REGARDING PROPOSED 16 TAC § 25.370ERCOTOpen
5848033Texas-New Mexico Power Company’s Public Comments Regarding Staff’s Proposal for Publication of New 16 TAC § 25.370TEXAS- NEW MEXICO POWER COMPANYOpen
5848034Comments of Eolian L.P. Proposal for PublicationEOLIAN, L.P.Open
5848035Data Center Coalition's CommentsData Center CoalitionOpen
5848036Sharyland Utilities, L.L.C.'s Initial Comments on the Proposal for Publication of New 16 TAC § 25.370SHARYLAND UTILITIES, L.L.C.Open
5848435Staff's Request for Information to TDUs w/11.14 Response DeadlinePUC RULES & PROJECTSOpen
5848130Enchanted Rock, LLC's Responses to Commission Staff's Questions for CommentENCHANTED ROCK, LLCOpen
5848434Enchanted Rock, LLC's Reply Comments on Commission Questions Regarding Transmission Cost RecoveryENCHANTED ROCK, LLCOpen
584816TCPA Response to Staff QuestionsTCPAOpen
584817EDGECONNEX RESPONSE TO STAFF’S QUESTIONS ON PROJECT NO. 58481; RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561EdgeConneXOpen
584818NRG Energy, Inc.'s Comments on PUCT Staff's QuestionsNRG ENERGY, INC.Open
584819Texas Public Power Association (TPPA) Response to Questions for CommentTPPAOpen
5848110Comments of CenterPoint Energy Houston Electric, LLCCENTERPOINT ENERGY HOUSTON ELECTRICOpen
5848111ONCOR'S RESPONSE TO COMMISSION STAFF’S FIRST SET OF QUESTIONS FOR COMMENTSONCOR ELECTRIC DELIVERY COMPANY LLCOpen
5848112RESPONSE TO QUESTIONS FOR COMMENTLCRA TRANSMISSION SERVICE CORPORATIONOpen
5848113DCC Comments on Project 58481, Rulemaking to Implement Large Load Interconnection StandardsData Center CoalitionOpen
5848114Comments of Eolian, L.P.EOLIAN, L.P.Open
5848115Responses of Texas Electric Cooperatives, Inc.Texas Electric Cooperatives, Inc.Open
5848116Sharyland Utilities, L.L.C's Comments to Commission Staff's Questions for CommentsSHARYLAND UTILITIES, L.L.C.Open
5848117VOID-SEE ITEM 30ENCHANTED ROCK, LLCOpen
5848118TEXAS INDUSTRIAL ENERGY CONSUMERS’ COMMENTSTIECOpen
5848119Eneus Response to Staff Questions on Project No. 58481Eneus EnergyOpen
5848120OPUC’S RESPONSES TO QUESTIONS FOR PUBLIC COMMENT RELATED TO THE IMPLEMENTATION OF PURA § 37.0561OPUCOpen
5848121ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSES TO STAFF QUESTIONSERCOTOpen
5848122AEP Texas Responses to Questions for Public CommentAEP TEXAS INC.Open
5848123COMMENTS OF THE BUREAU OF ECONOMIC GEOLOGY, THE UNIVERSITY OF TEXAS AT AUSTIN Filed by: COMPASS - Collaborative Optimization & Management of Power Allocation – Surface & Subsurface strategiesCOMPASS, Bureau of Economic GeologyOpen
5848124TEBA Responses to Staff Questions on Project 58481TEXAS ENERGY BUYERS ALLIANCEOpen
5848125TESLA comments on Project 58481TESLA, INC.Open
5848126COMMENTS ON LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561SIERRA CLUBOpen
5848127Texas-New Mexico Power Company's Comments to Commission Staff's Questions for CommentTEXAS-NEW MEXICO POWER COMPANYOpen
5848128Lancium Comments on Project No. 58481LANCIUM, LLCOpen
5848129Satoshi Comments on Project No. 58481SATOSHI ENERGY CORP.Open
5848433VOID-SEE ITEM 34ENCHANTED ROCK, LLCOpen
584815Cholla, Inc. Response to Staff Questions on Project No. 58481; Large Load Interconnection Framework RecommendationsCholla, Inc.Open
584814SCHAPER ENERGY CONSULTING LLC RESPONSE TO STAFF’s QUESTIONS ON PROJECT NO. 58481; RULEMAKING TO IMPLEMENT LARGE LOAD INTERCONNECTION STANDARDS UNDER PURA §37.0561Schaper Energy Consulting LLCOpen
584813OPUC NOTICE OF PARTICIPATION LETTEROPUCOpen
5847914Texas Register Acknowledgement of Receipt-Comments Due October 17, 2025RULES & PROJECTSOpen
5847915ERCOT LETTER RE STAND-ALONE GENERATION RESOURCE LIST UPDATEERCOTOpen
584809Texas Register Acknowledgement of Receipt-Comments Due October 17, 2025RULES & PROJECTSOpen
5847912LETTER & PRESENTATION REGARDING ERCOT STUDIES OF PROPOSED NET METERING ARRANGEMENTSERCOTOpen
5847913PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.205PUC OPDMOpen
584808PROPOSAL FOR PUBLICATION OF NEW 16 TAC §25.370PUC OPDMOpen
5847911OM Item No. 9 - Staff Memo & PFP w/Oct. 17 Comment DeadlinePUC RULES & PROJECTSOpen
584807OM Item No. 10 - Staff Memo & PFP w/Oct. 17 Comment DeadlinePUC RULES & PROJECTSOpen
584812Staff Memo and Questions for Comment w/Oct. 10 Comment DeadlinePUC RULES & PROJECTSOpen
5847910SATOSHI ENERGY COMMENTS ON STAFF’S DRAFT DISCUSSION RULE § 25.205SATOSHI ENERGY CORP.Open
584844COMMENTS OF VITOL INC. PROJECT NO. 58484Vitol Inc.Open
584845ONCOR ELECTRIC DELIVERY'S RESPONSE TO COMMISSION STAFF'S FIRST SET OF QUESTIONS FOR COMMENTSONCOR ELECTRIC DELIVERY COMPANY LLCOpen
584846ERCOT Steel Mills' Response to PUC Staff's Initial Request for Comments on Transmission Cost RecoveryERCOT STEEL MILLSOpen
584847RESPONSES OF TEXAS ELECTRIC COOPERATIVES, INC.TEXAS ELECTRIC COOPERATIVES, INC.Open
584848Joint Responses to Staff Questions of H-E-B and STECH-E-B, LP and South Texas Electric Cooperative, Inc.Open
584849Steering Committee of Cities Served by Oncor and Texas Coalition for Affordable Power's Responses to Commission Staff's First Set of Questions for CommentSTEERING COMMITTEE OF CITIES SERVED BY ONCOR AND TEXAS COALITION FOR AFFORDABLE POWEROpen
5848410CPS Energy's Response to Questions for CommentCPS ENERGYOpen
5848411TCPA Response to Staff QuestionsTCPAOpen
5848412Texas Public Policy Foundation's Response to PUC Staff Questions for CommentTexas Public Policy FoundationOpen
5848413Sharyland Utilities LLC's Initial Comments to Commission Staff's Questions for CommentSHARYLAND UTILITIES LLCOpen
5848414Comments of NRG Energy, Inc. in Response to Staff's August 5, 2025, QuestionsNRG ENERGY, INC.Open
5848415TEBA Comments on Transmission Cost AllocationTEXAS ENERGY BUYERS ALLIANCEOpen
5848416TEXAS INDUSTRIAL ENERGY CONSUMERS’ COMMENTSTIECOpen
5848417TEXAS ADVANCED ENERGY BUSINESS ALLIANCE RESPONSES TO COMMISSION STAFF QUESTIONS AUG. 5 2025TEXAS ADVANCED ENERGY BUSINESS ALLIANCEOpen
5848418Texas Public Power Association (TPPA) Comments on Transmission Cost Recovery Questions for CommentTPPAOpen
5848419LCRA AND LCRA TRANSMISSION SERVICES CORPORATION'S RESPONSE TO QUESTIONS FOR COMMENTLCRA AND LCRA TRANSMISSION SERVICES CORPORATIONOpen
5848420Joint Comments of Wind Energy Transmission Texas, LLC; Lone Star Transmission Texas, LLC; and Cross Texas Transmission, LLC in Response to Commission Staff’s Request for CommentsWind Energy Transmission Texas, LLC; Lone Star Transmission Texas, LLC; and Cross Texas Transmission, LLCOpen
5848421AEP COMPANIES’ COMMENTS ON QUESTIONS FOR PUBLIC COMMENTAEP COMPANIESOpen
5848422Comments of Texas-New Mexico Power CompanyTEXAS NEW MEXICO POWER COMPANYOpen
5848423OPUC’S INITIAL COMMENTS ON QUESTIONS FOR PUBLIC COMMENT RELATING TO THE EVALUATION OF TRANSMISSION COST RECOVERYOPUCOpen
5848424ELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.’S RESPONSES TO STAFF QUESTIONSERCOTOpen
5848425IREN Limited Response to Commission QuestionsIREN LimitedOpen
5848426CenterPoint Energy Houston Electric, LLC’s Responses to Commission Staff’s Request for CommentsCENTERPOINT ENERGY HOUSTON ELECTRICOpen
5848427PEC Responses to Commission Staff’s Request for CommentsPEDERNALES ELECTRIC COOPERATIVE, INCOpen
5848428Comments of Eolian L.P.EOLIAN, L.P.Open
5848429Vistra CommentsVISTRA CORPORATE SERVICES COMPANY LLCOpen
5848430Initial comments of Sierra Club in 58484SIERRA CLUBOpen
5848431REPLY COMMENTS OF ANTORA ON STAFF QUESTIONS: EVALUATION OF TRANSMISSION COST RECOVERY PUBLIC UTILITY COMMISSION OF TEXASAntora EnergyOpen
5848432COMMENTS OF CONVERGENT ENERGY AND POWER IN RESPONSE TO PUC STAFF’S REQUEST FOR COMMENTS OF TRANSMISSION COST RECOVERYConvergent Energy and PowerOpen
584799Crusoe's Comments on Staff's Draft Discussion Rule § 25.205Crusoe Energy Systems, Inc.Open
584797ONCOR'S COMMENTS ON STRANDED/UNDERUTILIZED ASSET COST TREATMENTONCOR ELECTRIC DELIVERY COMPANY LLCOpen
584798OPUC’S INITIAL COMMENTS ON DISCUSSION DRAFT ATTACHMENT B TO COMMISSION STAFF’S MEMORANDUM ON RULEMAKING FOR NET METERING ARRANGEMENTS INVOLVING A LARGE LOAD CO-LOCATED WITH AN EXISTING GENERATION RESOURCEOPUCOpen
584806OPUC’S INITIAL COMMENTS ON DISCUSSION DRAFT ATTACHMENT B TO COMMISSION STAFF’S MEMORANDUM ON RULEMAKING TO ESTABLISH LARGE LOAD FORECASTING CRITERIAOPUCOpen
584795ERCOT LETTER RE NET METERING STUDY DETAILSERCOTOpen
584796ERCOT PRESENTATION ON SB6 NET METERING ARRANGEMENT REVIEW PROCESSERCOTOpen
584805ERCOT PRESENTATION ON SB 6 LOAD FORECASTING PROCESSESERCOTOpen
584794Staff memo, workshop agenda, and discussion draftPUC RULES & PROJECTSOpen
584804Staff memo, workshop agenda, and discussion draftPUC RULES & PROJECTSOpen
584793Staff Memo and Notice of 9/2 WorkshopPUC RULES & PROJECTSOpen
584803Staff Memo and Notice of 9/2 WorkshopPUC RULES & PROJECTSOpen
584802OPUC NOTICE OF PARTICIPATION LETTEROPUCOpen
584792OPUC NOTICE OF PARTICIPATION LETTEROPUCOpen
584843OPUC NOTICE OF PARTICIPATION LETTEROPUCOpen
584842Staff Memo and First Set of Questions for CommentPUC RULES & PROJECTSOpen
584821Request for Control NumberPUC RULES AND PROJECTSOpen
584841Request for Control NumberPUC RULES & PROJECTSOpen
584791Request for Control NumberPUC RULES AND PROJECTSOpen
584801Request for Control NumberPUC RULES & PROJECTSOpen
584811Request for Control NumberPUC RULES & PROJECTSOpen