# Reviewed source-version provenance for the Batch Zero form set on the ERCOT
# Large Load Integration page. This is a source comparison, not compliance
# advice: routing text is quoted from the page, and nothing here decides which
# eligibility path or form applies to any particular project.
version: 2
updated: "2026-07-24"

source:
  id: lli_hub
  url: "https://www.ercot.com/services/rq/large-load-integration"

scope: >
  Every form and attestation listed on the Large Load Integration page as of
  2026-07-24, plus the two Protocol Section 23 forms (Form W, Form X), which
  the page has linked by title to the Current Protocols page since 2026-07-15;
  their current versions are the ratified Nodal Protocols documents resolved
  there. Guides and informational documents on the page are enumerated under
  page_documents_not_form_reviewed. The Section 9.2.1.1(1) and 9.2.1.2(1)
  attestations are path-specific eligibility documents; the routing recorded
  per family is ERCOT's published text, not an applicability determination.

review_method:
  - Downloaded each recorded URL and verified its bytes against the SHA-256 already committed in manifest.json.
  - Compared layout-preserving extracted text and page renders for every adjacent version.
  - Compared AcroForm field names and types so invisible form-function changes were not misclassified as metadata-only.
  - Cell-level-compared XLSX workbooks (sheet inventory, every non-empty cell) and text-compared DOCX bodies (paragraphs plus deduplicated table cells) for every adjacent version.
  - Captured each form's routing verbatim from the Large Load Integration page routing table and form descriptions (page retrieved 2026-07-21T06:10:56Z; preserved at data/archive/2026-07-21/lli-hub.html).
  - Re-reviewed the Large Load Integration page on 2026-07-24; only the FAQ link changed from V7 to V8.1, and the routing table was unchanged (page retrieved 2026-07-24T05:02:49Z; preserved at data/archive/2026-07-24/lli-hub.html).
  - Re-verified delisted documents byte-for-byte at their recorded URLs on 2026-07-21.

families:
  - id: affiliate_attestation
    name: ERCOT Affiliate Attestation Form
    current_url: "https://www.ercot.com/files/docs/2026/06/23/ERCOT-Affiliate-Form-Version-Two.pdf"
    routing: >
      Page routing table: "ILLE submits to Interconnecting DSP ot TSP, as
      applicable on or before July 10 or July 24, 2026, as applicable."
      [sic "ot"; retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2026/06/23/ERCOT-Affiliate-Attestation-Form.pdf"
        sha256: "8aa77f3da1a86662f3aab8a64ddd40d5ac1c17e926b6e3ca310868c3234d733d"
        first_seen: "2026-06-24T00:35:55Z"
        status: superseded
        superseded_by: "https://www.ercot.com/files/docs/2026/06/23/ERCOT-Affiliate-Form-Version-Two.pdf"
      - url: "https://www.ercot.com/files/docs/2026/06/23/ERCOT-Affiliate-Form-Version-Two.pdf"
        sha256: "357415916ded04163922ae3b31c0b4c8a85302d4a3fd959ac8530ff6be7d4500"
        first_seen: "2026-06-26T19:34:24Z"
        status: current
        supersedes: "https://www.ercot.com/files/docs/2026/06/23/ERCOT-Affiliate-Attestation-Form.pdf"
        change:
          classification: substantive
          categories: [eligibility, evidence, instructions]
          summary: >
            Replaces generic evidence labels with Planning Guide-specific checklist items,
            adds membership interests to the listed affiliation bases, and removes Section
            9.2.1.4(3)(d) from the affiliate-supported eligibility paths. Signature,
            notarization, attachment, and deadline language did not change.

  - id: section_9_2_1_1_1_e
    name: ERCOT Section 9.2.1.1(1)(e) Attestation
    current_url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-e-Attestation-v2.pdf"
    routing: >
      Page routing table: "ILLE submits to Interconnecting DSP or TSP on or
      before July 10, 2026." [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-e-Attestation.pdf"
        sha256: "72a68bd3b89eabbf4443e9ca3cdbe7113b5bd499b5ea362d7f210a34bea40e89"
        first_seen: "2026-06-12T00:39:05Z"
        status: superseded
        superseded_by: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-e-Attestation-v2.pdf"
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-e-Attestation-v2.pdf"
        sha256: "9b785d72d9ec9207bea67692edeb5d830b12ba475afdd73272a33234dde98337"
        first_seen: "2026-06-24T00:35:55Z"
        status: current
        supersedes: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-e-Attestation.pdf"
        change:
          classification: procedural
          categories: [form_fields]
          summary: >
            Visible text, pagination, and page renders are unchanged. The revision replaces
            one generic AcroForm text field with three page-specific fillable text fields on
            pages 7, 8, and 10; no obligation, evidence, signature, notarization, attachment,
            or deadline language changed.

  - id: section_9_2_1_1_1_f
    name: ERCOT Section 9.2.1.1(1)(f) Attestation
    current_url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-f-Attestation_v3.pdf"
    routing: >
      Page routing table: "ILLE submits to Interconnecting DSP or TSP on or
      before July 10, 2026." [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-f-Attestation.pdf"
        sha256: "82f71c305eef206c87e02e3d058300256bfd092e357782bff16752a6a09e170f"
        first_seen: "2026-06-12T00:39:05Z"
        status: superseded
        superseded_by: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-f-Attestation-v2.pdf"
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-f-Attestation-v2.pdf"
        sha256: "564f9960c65adaa3e335820c1737712d4a54be62b6f48425fa1bdce6a2a35380"
        first_seen: "2026-06-24T00:35:55Z"
        status: superseded
        supersedes: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-f-Attestation.pdf"
        superseded_by: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-f-Attestation_v3.pdf"
        change:
          classification: procedural
          categories: [form_fields]
          summary: >
            Visible text, pagination, and page renders are unchanged. The revision replaces
            one generic AcroForm text field with four page-specific fillable text fields on
            pages 7, 8, 10, and 11; no obligation, evidence, signature, notarization,
            attachment, or deadline language changed.
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-f-Attestation_v3.pdf"
        sha256: "0427478757fb137f6fdd673cada23b950cffe35e41d766bdebc0fbbc25b8cebb"
        first_seen: "2026-07-01T13:48:26Z"
        status: current
        supersedes: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-f-Attestation-v2.pdf"
        change:
          classification: procedural
          categories: [form_fields, notarization]
          summary: >
            Replaces the literal designated-ILLE-name placeholder in the notarization
            representation with a blank line and a dedicated fillable text field. The
            notarization representation and all substantive form language are otherwise unchanged.

  - id: section_9_2_1_1_1_g
    name: ERCOT Section 9.2.1.1(1)(g) Attestation
    current_url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-g-Attestation_v3.pdf"
    routing: >
      Page routing table: "ILLE submits to Interconnecting DSP or TSP on or
      before July 10, 2026." [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-g-Attestation.pdf"
        sha256: "f9ea7004ef4168e698d7fe5483f9d63b69900673b89e93c845020b03f5dd71f2"
        first_seen: "2026-06-12T00:39:05Z"
        status: superseded
        superseded_by: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-g-Attestation-v2.pdf"
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-g-Attestation-v2.pdf"
        sha256: "2766f53f6aea9e0482df575e071d32b6049fcc1b88001539da10ee8cb26b0b9d"
        first_seen: "2026-06-24T00:35:55Z"
        status: superseded
        supersedes: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-g-Attestation.pdf"
        superseded_by: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-g-Attestation_v3.pdf"
        change:
          classification: procedural
          categories: [form_fields]
          summary: >
            Visible text, pagination, and page renders are unchanged. The revision replaces
            one generic AcroForm text field with two page-specific fillable text fields on
            pages 6 and 7; no obligation, evidence, signature, notarization, attachment, or
            deadline language changed.
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-g-Attestation_v3.pdf"
        sha256: "e4d021422e96ce3a18f762b030e9dec47c5a1990b109324f668f932b2d8c19a5"
        first_seen: "2026-07-01T13:48:26Z"
        status: current
        supersedes: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.1-1-g-Attestation-v2.pdf"
        change:
          classification: procedural
          categories: [form_fields, notarization]
          summary: >
            Replaces the literal designated-ILLE-name placeholder in the notarization
            representation with a blank line and a dedicated fillable text field. The
            notarization representation and all substantive form language are otherwise unchanged.

  - id: section_9_2_1_2_1
    name: ERCOT Section 9.2.1.2(1) Attestation Form
    current_url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.2-1-Attestation-Form-v2-1-.pdf"
    routing: >
      Page routing table: "ILLE submits to Interconnecting DSP or TSP on or
      before July 24, 2026." A Section 9.2.1.2 eligibility-path submission
      routed to the interconnecting DSP/TSP, not to ERCOT. [retrieved
      2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.2-1-Attestation-Form-v2.pdf"
        sha256: "fafe5dd6ad784542cf12944c9ef36eef64cc36a3249137e18639f7e942286806"
        first_seen: "2026-06-12T00:39:05Z"
        status: superseded
        superseded_by: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.2-1-Attestation-Form-v2-1-.pdf"
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.2-1-Attestation-Form-v2-1-.pdf"
        sha256: "036193ee74412d16474feb815a771c2723438f1bc3fe95cc6e630ded0d2b4b89"
        first_seen: "2026-06-24T00:35:55Z"
        status: current
        supersedes: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.2-1-Attestation-Form-v2.pdf"
        change:
          classification: procedural
          categories: [form_fields]
          summary: >
            Visible text, pagination, and page renders are unchanged. The revision replaces
            one generic AcroForm text field with three page-specific fillable text fields on
            pages 5, 7, and 8; no obligation, evidence, signature, notarization, attachment,
            or deadline language changed.

  - id: batch_zero_lif
    name: Batch Zero Load Information Form (LIF)
    current_url: "https://www.ercot.com/files/docs/2026/06/18/Batch-Zero-Load-Information-Form-06172026.xlsx"
    routing: >
      Page routing table: "Interconnecting TSP submits to ERCOT on or before
      July 24, 2026." Page description: "The Interconnecting TSP must submit
      this workbook and all required submission items (cc'ing the DSP and ILLE
      on the submission) to ERCOT by July 24, 2026." TSP-to-ERCOT submissions
      go to BatchZero@ercot.com. [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2026/06/18/Batch-Zero-Load-Information-Form-06172026.xlsx"
        sha256: "f1f3a9ef348525fe1795be77133b7e57904d1008ea61beb38a69d2504a2f9cf1"
        first_seen: "2026-06-19T12:21:31Z"
        status: current

  - id: load_information_form
    name: Load Information Form (Communication of Large Load Information)
    current_url: "https://www.ercot.com/files/docs/2025/12/15/Load-Information-Form_v2.xlsx"
    routing: >
      Not part of the Batch Zero routing table. Listed on the page alongside
      the Instructions for Communication of Large Load Information, which
      govern its submission. [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2025/12/15/Load-Information-Form_v1.xlsx"
        sha256: "ef603b2f78078e84ec5d471160873c0282f9094afad712db872d6dd574feadab"
        first_seen: "2026-06-12T00:39:05Z"
        status: superseded
        superseded_by: "https://www.ercot.com/files/docs/2025/12/15/Load-Information-Form_v2.xlsx"
      - url: "https://www.ercot.com/files/docs/2025/12/15/Load-Information-Form_v2.xlsx"
        sha256: "21b88f04f702095a92055c53b19118728f766432fc73f064bad2c1910fd20404"
        first_seen: "2026-06-19T12:21:31Z"
        status: current
        supersedes: "https://www.ercot.com/files/docs/2025/12/15/Load-Information-Form_v1.xlsx"
        change:
          classification: procedural
          categories: [instructions, form_fields]
          summary: >
            The workbook's own revision history adds row 2 dated 2026-06-03: "revision to
            raise awareness of Protocol Section 1.3.1.1(1)(r)". Adds the Protected
            Information notice (Protocol Section 1.3.1.1(1)(r)) to the Instructions, LIF,
            and LCP sheets, renumbers the LCP sheet's illustrative example rows with revised
            example project entries, and removes one background-data lookup formula. No
            obligation, evidence, signature, or deadline language changed.

  - id: dynamic_stability_study_form
    name: ERCOT Interconnecting TSP Dynamic Stability Study Form
    current_url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Interconnecting-TSP-Dynamic-Stability-Study-Form-v2.pdf"
    routing: >
      Page routing table: "Interconnecting TSP submits to ERCOT on or before
      July 24, 2026." TSP-to-ERCOT submissions go to BatchZero@ercot.com.
      [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Interconnecting-TSP-Dynamic-Stability-Study-Form.pdf"
        sha256: "1e89a678af581c49001aecb7ba40b31c97d9d17c0c5659f78ae886c85f06209f"
        first_seen: "2026-06-12T00:39:05Z"
        status: superseded
        superseded_by: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Interconnecting-TSP-Dynamic-Stability-Study-Form-v2.pdf"
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Interconnecting-TSP-Dynamic-Stability-Study-Form-v2.pdf"
        sha256: "c3f3c0c4f9bdd8d3ac9c4c80a94a3e536a626988fc4c13711d389cf379cf7409"
        first_seen: "2026-07-01T17:37:31Z"
        status: current
        supersedes: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Interconnecting-TSP-Dynamic-Stability-Study-Form.pdf"
        change:
          classification: procedural
          categories: [signature, formatting]
          summary: >
            Retitles the closing "Notarization" heading to "Signature Block". The
            representation text, signature lines, and all 26 AcroForm fields are unchanged;
            neither version's extracted text contains notary-acknowledgment language, so the
            new heading matches the block's existing content. No obligation, evidence, or
            deadline language changed.

  - id: section_9_2_1_1_1_b
    name: ERCOT Section 9.2.1.1(1)(b) Attestation
    current_url: "https://www.ercot.com/files/docs/2026/06/18/ERCOT-Section-9.2.1.1-1-b-Attestation.pdf"
    routing: >
      Page routing table: "ILLE submits to Interconnecting DSP or TSP on or
      before July 10, 2026." [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2026/06/18/ERCOT-Section-9.2.1.1-1-b-Attestation.pdf"
        sha256: "f169db1418072d93dc0eb28eda4b1d5242bd599e13df167f6ce7dac54030ee3d"
        first_seen: "2026-06-19T12:21:31Z"
        status: current

  - id: section_9_2_1_1_1_c_d
    name: ERCOT Sections 9.2.1.1(1)(c) and (d) Form
    current_url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Sections-9.2.1.1-1-c-and-d-Form.pdf"
    routing: >
      Page routing table ("Section 9.2.1.1(1)(c) and (d) Attestation"): "ILLE
      submits to Interconnecting DSP or TSP on or before July 10, 2026."
      [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Sections-9.2.1.1-1-c-and-d-Form.pdf"
        sha256: "df7246be9094fdf2fb79791ec0f5ff5589f7350ca304f19f8b39b42b2d261733"
        first_seen: "2026-06-12T00:39:05Z"
        status: current

  - id: section_9_2_1_4_3_d
    name: ERCOT Section 9.2.1.4(3)(d) Attestation
    current_url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.4-3-d-Attestation.pdf"
    routing: >
      Page routing table: "Interconnecting TSP submits to ERCOT on or before
      July 24, 2026." TSP-to-ERCOT submissions go to BatchZero@ercot.com.
      [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2026/06/05/ERCOT-Section-9.2.1.4-3-d-Attestation.pdf"
        sha256: "28784bebaa6dc23ffad960c3e3e20ecaa83294eee244218f0a29812ac40595f1"
        first_seen: "2026-06-12T00:39:05Z"
        status: current

  - id: form_w
    name: "Section 23 Form W: Declaration of Intent and Commitment to Register as a Provisional Controllable Load Resource"
    current_url: "https://www.ercot.com/files/docs/2026/07/01/23W-071126_Nodal.docx"
    routing: >
      Page routing table: "ILLE submits to Interconnecting DSP or TSP on or
      before July 10, 2026." Page description: "The ILLE must complete, sign,
      and notarize Part A and submit it to the Interconnecting DSP or TSP by
      July 10, 2026. The Interconnecting DSP or TSP must then submit the form
      to ERCOT by July 24, 2026." [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2026/06/15/1325NPRR-Form-W.docx"
        sha256: "30a7417515ce396cbdaad9398c2af46fccf974ec4210f7df4644e7e8d69cedf1"
        first_seen: "2026-06-16T12:36:03Z"
        status: superseded
        superseded_by: "https://www.ercot.com/files/docs/2026/07/01/23W-071126_Nodal.docx"
      - url: "https://www.ercot.com/files/docs/2026/07/01/23W-071126_Nodal.docx"
        sha256: "2ebaac83503504fde24b3cea1cfa8b6052962e7d0803174540ddd2862b05b149"
        first_seen: "2026-07-21T15:47:47Z"
        status: current
        supersedes: "https://www.ercot.com/files/docs/2026/06/15/1325NPRR-Form-W.docx"
        change:
          classification: procedural
          categories: [instructions, routing, deadline, metadata, formatting]
          summary: >
            The ratified Nodal Protocols Section 23 form dated July 11, 2026 (NPRR1325's
            effective date). Replaces the draft-era instructions paragraph — which described
            the form as "subject to approval by the Public Utility Commission of Texas",
            carried the return-to-DSP/TSP-by-July-10-2026 routing sentence, and the
            llwg_feedback@ercot.com contact — with the official protocol header, and spells
            out or contracts cross-reference titles and acronyms throughout. All nine
            numbered Part A commitments, the notarization representations, and Part B are
            substantively unchanged (verified by full text comparison of every numbered
            item).
        listing:
          state: linked_via
          via_url: "https://www.ercot.com/services/rq/large-load-integration"
          verified_at: "2026-07-21T15:38:24Z"
          note: >
            Since 2026-07-15 the Large Load Integration page links the form by title to
            the Current Protocols page (anchor href /mktrules/nprotocols/current) rather
            than to a direct file; the anchor resolves there to this document, which the
            manifest inventories under the nprotocols source.

  - id: form_x
    name: "Section 23 Form X: Withdrawal-Limited Private Use Network Designation"
    current_url: "https://www.ercot.com/files/docs/2026/07/01/23X-071126_Nodal.docx"
    routing: >
      Page routing table: "ILLE submits to Interconnecting DSP or TSP on or
      before July 10, 2026." Page description: "The completed form must be
      submitted to the Interconnecting DSP or TSP by July 10, 2026, and the
      Interconnecting DSP or TSP must submit the form to ERCOT by July 24,
      2026." The form body retains verbatim: "The completed and executed form
      must be delivered to the applicable Interconnecting Distribution Service
      Provider (DSP) or Interconnecting Transmission Service Provider (TSP) by
      July 10, 2026." [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2026/06/15/1325NPRR-Form-X.docx"
        sha256: "07e07d0fc823fdbae41930a47637cf04adbfb9cd6c448b36193726f5bc7f2869"
        first_seen: "2026-06-16T12:36:03Z"
        status: superseded
        superseded_by: "https://www.ercot.com/files/docs/2026/07/01/23X-071126_Nodal.docx"
      - url: "https://www.ercot.com/files/docs/2026/07/01/23X-071126_Nodal.docx"
        sha256: "7a26982ff6b63219522e79ea6feea59b967d9de7a208f9e02cd254e3cc2987c0"
        first_seen: "2026-07-21T15:47:47Z"
        status: current
        supersedes: "https://www.ercot.com/files/docs/2026/06/15/1325NPRR-Form-X.docx"
        change:
          classification: procedural
          categories: [instructions, metadata, formatting]
          summary: >
            The ratified Nodal Protocols Section 23 form dated July 11, 2026 (NPRR1325's
            effective date). Replaces the draft-era instructions paragraph (which described
            the form as "subject to approval by the Public Utility Commission of Texas" and
            carried the llwg_feedback@ercot.com contact) with the official protocol header,
            and expands abbreviations (ILLE, IE, GINR, Resource Entity). The
            delivered-to-DSP/TSP-by-July-10-2026 sentence, the execution and notarization
            requirements, and all designation content are substantively unchanged (verified
            by full text comparison).
        listing:
          state: linked_via
          via_url: "https://www.ercot.com/services/rq/large-load-integration"
          verified_at: "2026-07-21T15:38:24Z"
          note: >
            Since 2026-07-15 the Large Load Integration page links the form by title to
            the Current Protocols page (anchor href /mktrules/nprotocols/current) rather
            than to a direct file; the anchor resolves there to this document, which the
            manifest inventories under the nprotocols source.

  - id: energization_request
    name: Energization Request for New Standalone Large Load
    current_url: "https://www.ercot.com/files/docs/2025/07/18/LLI_Standalone_Energization_Request_05292026.docx"
    routing: >
      Not part of the Batch Zero routing table. Form instructions: completed by
      the interconnecting TSP, "signed by the Authorized Representative or
      backup AR, returned to ERCOT, and approved before the Large Load may be
      energized." [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2025/07/18/LLI_Standalone_Energization_Request_20250707.docx"
        sha256: "b7d13edf6d628c65208d560bf8394affd40b4d7a1bc266016a591356ea8c15ec"
        first_seen: "2026-06-12T00:39:05Z"
        status: superseded
        superseded_by: "https://www.ercot.com/files/docs/2025/07/18/LLI_Standalone_Energization_Request_05292026.docx"
      - url: "https://www.ercot.com/files/docs/2025/07/18/LLI_Standalone_Energization_Request_05292026.docx"
        sha256: "51b22ecb9230448effc2be9f66e65a0abcb453e12c0f355817e8f8592533f478"
        first_seen: "2026-06-19T12:21:31Z"
        status: current
        supersedes: "https://www.ercot.com/files/docs/2025/07/18/LLI_Standalone_Energization_Request_20250707.docx"
        change:
          classification: procedural
          categories: [instructions, formatting]
          summary: >
            Appends to the instructions the Protected Information sentence (Protocol
            Section 1.3.1.1(1)(r)) covering customer-specific information submitted via the
            form, and adjusts table cell-merge geometry. Field labels, obligations,
            signature, and deadline language are unchanged.

  - id: net_metering_notice
    name: Notice of Proposed Net Metering Arrangement Form
    current_url: "https://www.ercot.com/files/docs/2025/09/02/Notice-of-Proposed-Net-Metering-Arrangement.docx"
    routing: >
      Not part of the Batch Zero routing table; listed on the page among forms
      for net-metering arrangements. [retrieved 2026-07-21]
    versions:
      - url: "https://www.ercot.com/files/docs/2025/09/02/Notice-of-Proposed-Net-Metering-Arrangement.docx"
        sha256: "60754bc44f0646f36be74c2fc4426a4eef222a667c67800ebb0017647bdcc9ca"
        first_seen: "2026-06-12T00:39:05Z"
        status: current

# Listed Large Load Integration page documents that are deliberately outside
# the reviewed-form scope. Every listed lli_hub document must be either a
# reviewed family version or enumerated here; ingest/validate.py fails on any
# unclassified document (fail-closed on new or unrecognized artifacts).
page_documents_not_form_reviewed:
  - url: "https://www.ercot.com/files/docs/2026/06/05/BatchZero-Timeline-and-Communications.pptx"
    reason: Guide (timeline/communications deck), not a submission form.
  - url: "https://www.ercot.com/files/docs/2026/06/26/Batch_Zero_Readiness_FAQs_V8.1.xlsx"
    reason: >
      Informational FAQ ("provided solely for informational purposes"),
      not a submission form. V8.1 adds 20 operational Q&As and corrects minor
      text; hashes are tracked in manifest.json.
  - url: "https://www.ercot.com/files/docs/2025/09/02/Stand-Alone-Generation-Resources-as-of-09.01.25-v2.pdf"
    reason: Reference list of stand-alone Generation Resources, not a form.
  - url: "https://www.ercot.com/files/docs/2025/12/15/Instructions-for-Communication-of-Large-Load-Information.docx"
    reason: Instructions document for the Load Information Form, not itself a form.
  - url: "https://www.ercot.com/files/docs/2025/12/24/Large-Load-Interconnection-Process-Q-A.pdf"
    reason: Informational Q&A document, not a submission form.
